This report provides an overview of the implementation and testing of PLC control and communication routines for the high voltage system. Key highlights include successful integration of the PVSS interface, testing of safety features, and ongoing installations at P2. The document outlines the technical note on device implementation, safety checks, and the state diagram within the PVSS user interface. Current steps involve completing cabling, testing the system, and integrating the FSM with DCS prior to releasing the technical note.

redford
Download Presentation

TPC Very High Voltage Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC Very High Voltage Control Status report 20/04/2006 Marco Boccioli

  2. Summary • PLC control and communication routines implemented and tested • PVSS interface implemented • Safety features tested • System being installed at P2 • Draft technical note: \\pcaitdc21\share\TPC

  3. Implementation: devices

  4. Implementation: State Diagram

  5. Implementation

  6. PVSS user interface

  7. Safety • Electrical safety checked • PLC safety routines tested

  8. Installing the system

  9. Installing the system Supervisory • PVSS with FSM • Schneider OPC server

  10. Installing the system PLC • Schneider Electric Premium P57 5634M

  11. Installing the system Power Supply • Heinzinger PNC 150000

  12. Installing the system ELMB • One for each side

  13. Installing the system Cabling • Seven points for each side

  14. What next… • End the cabling • Test the installed system • Integrate the FSM with DCS • Release the technical note (\\pcaitdc21\share\TPC)