ERCOT Regional Load Forecast and Reserve Margin Update

This update provides revised load forecasts and reserve margin calculations for the ERCOT region based on the ERCOT Econometric Load Forecast. It includes an analysis of temperature sensitivity and potential peak load increases. The 12.5% reserve margin requirement is discussed.

rbarnhart
Download Presentation

ERCOT Regional Load Forecast and Reserve Margin Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operations Update Revised 2005-2010 ERCOT Regional Load Forecast and Reserve Margin Update Utilizing The ERCOT Econometric Load Forecast ERCOT Board Meeting June 21, 2005

  2. Updated Reserve MarginCalculation – May 17th Board Meeting

  3. ERCOT Econometric Peak Forecast 1.83% Avg. Growth

  4. ERCOT Econometric Energy Forecast 2.10% Avg. Growth

  5. Reserve Margin w/GATF Changes and Econometric Forecast

  6. Temperature Sensitivity • Sensitivity studies indicate that sustained high summer temperatures could result in peak load increases of up to 4% • This is one of the variables considered in the adoption of the 12.5% reserve margin requirement