Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools

Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools. Spring 2013. الاقتراع للسند المالي لعام 2013 خطة ذكية لاستمرار الامتياز في مدارس ديربورن الرسمية. ربيع 2013. A Look Back. Last Bond Approved By Voters - 2002 Needs Addressed-

Download Presentation

Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools Spring 2013

  2. الاقتراع للسند المالي لعام 2013 خطة ذكية لاستمرار الامتياز في مدارس ديربورن الرسمية ربيع 2013

  3. A Look Back • Last Bond Approved By Voters - 2002 • Needs Addressed- • Overcrowding & Technology • $150 Million • Four New Schools • Additions At Three High Schools • Technology/Electrical Infrastructure Promises Made, Promises Kept!

  4. نظرة إلى الماضي • * آخر سند صوت عليه من قبل الناخبين-2002 • الاحتياجات التي تم تلبيتها – • ازدياد عدد الطلاب وتطوير التكنولوجيا • * 150 مليون دولار • - أربعة مدارس جديدة • - إضافات على مباني الثانويات الثلاث • - التكنولوجيا/ البنية التحتية للكهرباء • _____________________________ وعدنا وأوفينا بالوعود

  5. School Board Management Of District Finances • Bond refinancing will save • taxpayers $1 million • Very strong bond rating (AA3 – Moody’s) • Plante-Moran study showed district was efficiently using resources • Annual Audit- • Receives highest allowed marks

  6. الإدارة المالية لمجلس التربية والتعليم في المنطقة التعليمية إعادة تمويل بعض السندات قد وفّر على دافعي الضرائب مليون دولار لدينا درجة عالية من التصنيف المالي من قبل- (AA3- Moody’s) أظهرت دراسة بلانت- موران أن المنطقة التعليمية تستخدم مواردها بكفاءة المراجعة المالية السنوية - نتلقى أعلى الدرجات الممكنة

  7. District Finances • Over the last five years- • 8.1% reduction in state funding • 2008-09 $9,082/pupil • 2012-13 $8,332/pupil • $4.9 million reduction • in At-Risk funding The State of Michigan is not investing in our schools!

  8. الحالة المالية للمنطقة التعليمية على مدى السنوات الخمس الماضية، 8.1 ٪ انخفاض في التمويل الحكومي 2009-2008 9,082$ / تلميذ سنة 2013-2012 8,332$ / تلميذ سنة تخفيض 4.9 مليون دولار في تمويل الاحتياجات المدرسية الخاصة إن ولاية ميشيغان لا تستثمر في مدارسنا

  9. Why Is There A Need For A Bond Proposal?

  10. لماذا هناك حاجة لاقتراح السندات؟

  11. Why A Bond Now? • Need to enhance school security • Aging inventory of building • 35- Total number of • buildings • 58- Average age of • buildings • 12- Number of buildings • between 50-70 • 9- Number of buildings • over 80 • 2- Number of buildings • over 90

  12. لماذا الآن؟ نحتاج إلى تعزيز أمن المدرسة قدم السلع المخزنة 35- مجموع عدد المباني 58- سنة معدل عمر المباني 12- منهم يعادل عمرهم ما بين 50-70 سنة 9- منهم فوق 80 سنة 2- منهم فوق 90 سنة

  13. Why A Bond Now? • Up Keep of Buildings • Past practice- annual commitment of $4-5 million in buildings & busses • Today- spend reactively on emergencies only

  14. لماذا الآن؟ المحافظة على المباني الممارسات الماضية- الالتزام ب 4-5 مليون دولار في المباني والحافلات اليوم- الإنفاق في الحالات الطارئة فقط

  15. Why A Bond Now? • Annual enrollment growth • 25 consecutive years • Gained more than 6,800 students • 2,400 student increase since 2000 • 8.1% reduction in state funding • State not funding required • on-line testing of all students • Aging Bus Inventory • No bus purchases in 4 years • Average age of bus 9 years • Useful life of a bus is 10 years • High cost to maintain aging fleet

  16. لماذا الاقتراع على السند المالي الآن؟ ازدياد عدد الطلاب سنويا على مدى 25 سنة متتالية انضم لمدارسنا أكثر من 6،800 طالب 2،400 طالب منذ عام 2000 8.1٪ انخفاض في التمويل الحكومي الولاية لا تمول كما يجب الاختبارات على الإنترنت لجميع الطلاب. الحافلات المدرسية قديمة. عدم شراء حافلات مدرسية منذ 4 سنوات يعادل عمر الحافلات 9 سنوات يفضل استخدام الحافلات لمدة 10 سنوات صيانة الحافلات مكلفة جدا

  17. S = Security الحماية / الأمان M= Modifications تعديلات A = Additions إضافات R = Renovationsالتجديدات T = Technology & Transportation التكنولوجيا والمواصلات 2013 S.M.A.R.T BOND Something For Everyone! All projects reviewed by bond legal council and all are approved bond projects

  18. 2013 S.M.A.R.T BOND • S = Security الحماية/ الأمان • Auto-lock Doors • أبواب تقفل أوتوماتيكيا • Buzzer Entry System • نظام تحكم لسماح الزوار بدخول المدرسة • Video Monitors in office • شاشات الفيديو في المكتب • All Schools • لكل المدارس

  19. Oakman Elementary Provide security cameras and secure entry Replace roof (sections) Upgrade technology infrastructure Provide digital site sign New media center furnishings New instructional technology equipment

  20. 2013 S.M.A.R.T BOND M = Modifications التعديلات • Roofs أسطح • Parking Lots • مواقف السيارات • Windows النوافذ

  21. 2013 S.M.A.R.T BOND • A = Additions الإضافات • Room additions at: • غرف إضافية في المدارس الابتدائية: • River Oaks Elementary • Geer Park Elementary • William Ford Elementary • Henry Ford Elementary

  22. 2013 S.M.A.R.T BOND • A = Additions الإضافات • River Oaks Elementary • Gym الجمنازيوم/ قاعة الرياضة • 6 Classrooms • 6 فصول دراسية/ صفوف • New Lockersخزانات جديدة • Parking Lot موقف السيارات • Estimated Cost- $4.4 million تقدر التكلفة – مليون /

  23. 2013 S.M.A.R.T BOND • A = Additions الإضافات • Geer Park Elementary • 6 Classrooms 6 فصول دراسية/ صفوف • Remodel تجديد صياغة • Multi-Purpose Area • الغرف المستخدمة لأغراض متعددة • Estimated Cost تقدر التكلفة /-$4.6 million مليون /

  24. 2013 S.M.A.R.T BOND • A = Additions الإضافات • William Ford Elementary • 6 Classrooms • 6 فصول دراسية • Estimated Cost تقدر التكلفة - $3 million

  25. 2013 S.M.A.R.T BOND • A = Additions الإضافات • Henry Ford Elementary • Keep front , pool, gym, and cafeteria of • existing original building • الكافتيريا, المسبح, الجمنازيوم, في المبنى الأصلي • Tear down portion of • original buildingهدم قسم من المبنى القديم • Replace 8-10 Classrooms • استبدال 8-10 فصول دراسية • Estimated Cost- $12 million تقدر التكلفة

  26. 2013 S.M.A.R.T BOND • R = Renovations التجديدات • Improvements at: تحسين المدارس التالية • Bryant $1.6 million* • Woodworth $3 – 4 million* • Dearborn High $0.8 million* • Edsel Ford $1.4 million* • Fordson $2.6 million* • *estimated cost

  27. 2013 S.M.A.R.T BOND • T = Technology التكنولوجيا • 7,000 computers (3,500 every 5 years) كمبيوتر 7,000 • Upgrades to equipment & licenses تحسين المعدات و الرخص • District–wide wireless أنترنت لاسلكي • Prepare District for required testing using computers • تحضير المنطقة التعليمية لاستخدام الكمبيوتر في اختبارات معينة • T = Transportation المواصلات • 30 new buses شراء 30 حافلة جديدة • Replaces aging fleet, not increase student bussing • استبدال الحفلات القديمة • All Schools Benefit

  28. 2013 S.M.A.R.T BOND • Every Building- كل المباني • الحماية Security • Every Building- • التكنولوجياTechnology • Every Building- • Projects Such As: • New lockers خزانات جديدة • New carpet سجاد جديد • Small renovation projects • Or other items مشاريع تجديد • as determined by school

  29. Summary of $76 Million Bond • Security الحماية0.6 • Grounds الأرضية0.8 • Buses الحافلات3.6 • Technology التكنلوجيا12.0 • Roofs, Parking Lots, Other 21.0 • السقف, مواقف السيارات, وغيرها • Additions & Projects 38.0 • إضافات و مشاريع Total المجموع $76 million

  30. 2013 S.M.A.R.T BOND If the S.M.A.R.T. Bond is approved the current 5.81 Mills will remain unchanged. No Tax Increase

  31. إذا تمت الموافقة على السند لن تتغير قيمة 5.81 ميل ( النسبة المئوية لكل ألف دولار من قيمة المنزل الضريبية ). لا زيادة في الضرائب

  32. Next Steps- الخطوات القادمة • March 26 - April 24: 26 مارس/ آذار- 24 أبريل/ نيسان • Staff, parents, and community from • each building meet with administration • to review possible projects سيجتمع الموظفون, والأهالي و الإداريين لمراجعة المشاريع المطروحة • April 24 - April 26: 24 – 26 أبريل/ بيسان • Each building meets with architects • to review proposed projectsستجتمع كل مدرسة مع المهندسين لمراجعة المشاريع المطروحة. • May 13: 13 مايو/ أيار • Report to Board on final projects تقدم تقارير المشاريع النهائية إلى مجلس الإدارة • November 5, 2013 Election الإنتخابات

  33. Thank You شكراً For more information- لمزيد من المعلومات www.dearbornschools.org or iblog.dearbornschools.org/2013bond/