Government Property: The New Hot Button. Robby Ragos CPPA. This Presentation Will Cover. What is Government Property? 5 Classifications of GP Importance of having an approved Property Management System Frequency of a Property Management System Audit (PMSA) Relevant GP FAR and DFARS Clauses.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Government Property: The New Hot Button' - quilla


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
this presentation will cover
This Presentation Will Cover
  • What is Government Property?
  • 5 Classifications of GP
  • Importance of having an approved Property Management System
  • Frequency of a Property Management System Audit (PMSA)
  • Relevant GP FAR and DFARS Clauses
scenario
Scenario
  • Joe Snuffy the engineer works at Sikorsky
  • He uses special test equipment (STE) and special tooling (ST) to work on DoD helicopters
  • Joe then gets assigned to work on a commercial contract, and uses the same STE and ST he used on DoD work

Could there be a problem?

slide5

YES! The USG pays for those tools to be used on that contract, and that contract alone.Raytheon was charged $18 million by the USAF for working on commercial products

Used tools on a separate contract.

what is government property
What is Government Property?
  • I’m often asked “What exactly is GFE, or GFP, or CAP, etc?”
  • Good question!!
slide7

What are the requirements to call something Government property?

FAR 45.101 States:"Government Property means all property 1. OWNED or 2. LEASED to the Government. Government property includes both Government-furnished and Contractor-acquired Property.”

slide8

DEFINITIONS

    • Government Furnished Property
      • means property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract.

TITLE ALWAYS

VESTS IN

GOVERNMENT

slide9

Contractor Acquired Property (CAP)

      • means property acquired, fabricated, or otherwise provided by the contractor for performing a contract and to which the Government has
      • title.
      • NOTE: So when you get right down to it…There is either GFP or CAP!!!
slide10

To give a general illustration:

    • GFE (Government Furnished Equipment)
      • Items such as those used for testing and evaluation. (All gadgets and widgets engineers use!)
    • GFM (Government Furnished Material)
      • Consumable materials are expected to be consumed or expended during performance. Once consumed, it’s gone.
    • GFP (Government Furnished Property) regardless of “stuff” being materials or tools, it’s all the same!
government property
Government Property
  • 1.“Stuff” the Government owns.
    • Items to which the Government has clear TITLE
    • Title evidencing the issue of OWNERSHIP.
    • Made available to the Contractor for use or consumption in the performance of the contract.
government property1
Government Property

2.“Stuff” the Government LEASES.

The Government leases and then provides/furnishes to the contractor for use (NOT consumption) .

  • Even though it’s LEASED, it’s still GP!.
slide13

“Wait, the Government doesn’t have title to that stuff while leasing. How can you say it is Government property?”

slide14

The Government wants the contractor to MANAGE, CONTROL AND PROTECT that “stuff” in the same fashion as Government property.

If you loaned me a lawn mower to cut my grass, you would want me to take care of that item as if it were my own, right?

Of course!!!!

was this managed and controlled properly
Was this managed and controlled properly?

Speaking of Management and Control…..

classes of government property
Classes of Government Property

MATERIAL

52.245-1(a)

45.101

EQUIPMENT

52.245-1(a)

45.101

SPECIAL

TOOLING

2.101

SPECIAL

TEST

EQUIPMENT

2.101

REAL

PROPERTY

52.245-1(a)

45.101

material
Material
  • Does not include equipment, ST, or STE
    • Consumed, expended, and incorporated
    • Uses a percentage of the remaining balance
    • Nuts, bolts, screws, washers, batteries, gas, silver, paint
special tooling
Special Tooling
  • Jigs, dies, fixtures, molds, gauges…Specialized nature
  • Used to the performance of particular services
special test equipment
Special Test Equipment
  • FAR 2.101 “either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract…”
equipment
Equipment

…tangible asset that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract.”

real property
Real Property
  • Land, rights in land (Mineral rights or riparian rights, ground improvements), sidewalks, utility distribution systems, and buildings.
  • Pretty simple, right?
slide23

So why should I be concerned with having an adequate property system and stay in compliance with DCMA regulations?

dfars 252 245 7005 feb 2012
DFARS 252.245-7005 (FEB 2012)
  • (d) Significant deficiencies
  • (e)…the Contracting Officer will withhold 5% of amounts due from progress payments and performance-based payments…
  • …direct contractor to withhold 5% from its billings on interim cost vouchers on CR, labor-hour, T&M until the CO has determined that the Ktr has corrected…
don t panic
Don’t panic!
  • Steps need to take place before withholds start happening
  • DCMA CARS Level I-IV
6 business systems
6 Business Systems
  • The USG expects that every responsible contractor has 6 Business Systems that are competent and auditable to be compliant and do business.
    • 6 Business Systems:
    • Material Management and Accounting (252.242-7004)
    • Cost Estimating (252.215-7002)
    • Earned Value (252.234-7002)
    • Contractor Purchasing (252.244-7001)
    • Accounting (252.242-7706)
    • Contractor Property Management System (252.245-7003)
importance of an approved adequate property system
Importance of an Approved/Adequate Property System
  • If the Government revokes assumption of risk,
  • Contractor is accountable and financially liable for ALL lost, damaged, destroyed or stolen property, at FULL cost to the contractor.

VERY Time Consuming and VERY COSTLY !

authority to audit
Authority to Audit
  • The FAR GP Clause 52.245-1(g) provides us detailed guidance as to the Government’s authorities and the contractor’s responsibilities in regard to a PMSA (Property Management System Audit). It says…..
authority to audit1
Authority to Audit
  • The Government shall have access to the contractor’s premises and all Government property, AT REASONABLE TIMES, for the purposes of reviewing, inspecting and evaluating the Contractor’s property management plan(s), systems, procedures, records, and supporting documentation that pertains to Gov’t property…..
  • What constitutes reasonable?
authority to audit2
Authority to Audit
  • (g) Systems analysis.
    • (2) Records of Government property shall be readily available (Upon request) to authorized Government personnel and shall be appropriately safeguarded.
requirements for performing audits
Requirements for Performing Audits
  • FAR 45.105 address the GOVERNMENT’S REQUIREMENT to audit the contractor.
  • FAR 52.245-1 addresses the CONTRACTOR’S REQUIREMENT to assess their PMS.

How frequently SHALL a Government PA perform a PMS audit??

IT DEPENDS!!

frequency of pmsa
Frequency of PMSA
  • The Risk Assessment and Rating affect how FREQUENTLY the Government PA will perform a PMSA:
    • The type of PMSA they will perform,
    • The Processes subject to review if a PMSA is performed
levels of risk
Levels of Risk
  • High Risk.  Perform a Standard PMSA at least annually until such time as the contractor improves to at least the moderate risk level and the PA determines that the status of the contractor's system justifies a reduced level of oversight.
  • Moderate Risk.  Perform a Standard, Limited PMSA or site visit as frequently as conditions warrant, but at least once every two years. 
  • Low Risk.  Perform a Standard, Limited PMSA or site visit as frequently as conditions warrant, but at least once every three years. 

http://guidebook.dcma.mil/34/INDEX.CFM

frequency of pmsa1
Frequency of PMSA
  • Criteria for assignment of a risk category may include:
    • Dollar value of Government Property accountable to that contractor (Higher value, higher risk).
    • Historical occurrences of Loss, Theft, Damage, or Destruction.
    • Physical inventory adjustments
    • Unauthorized use of Government Property(Scenario 1!)
processes and outcomes
Processes and Outcomes

The primary Government Property Clause at 52.245-1 requires the Contractor to develop property management plans, systems, and procedures at the contract, program, site or entity level to enable the ten outcomes/ processes (listed i to x):

Acquisition of Property

Receiving of Government Property

Records

Physical Inventory

Subcontractor Control

Reports

processes and outcomes1
Processes and Outcomes
  • Relief of Stewardship Responsibility (Liability)
    • Disposition
    • Cannibalization
    • Shipping
  • Utilization
    • Storage
    • Consumption of Material
    • Movement
  • Maintenance
  • Property Closeout
acquisition
Acquisition
  • Far 52.245-1 (f)
  • (i) Acquisition of Property. The Contractor shall document that all property was acquired consistent with its engineering, production planning, and material control operations.
  • Is the Ktr following the PROCESS for managing the ACQUISITION of PROPERTY that IS or BECOMES Government Property??
receiving
Receiving
  • Far 52.245-1 (f)
  • Are you adjusting for overages, shortages, damages/discrepancies discovered upon receipt?
  • How are you handling hazardous materials?
    • Properly qualified personnel handling it?
  • Are you properly documenting all incoming deliveries?
records
Records
  • FAR 52.245-1(f)
  • Records of Government Property. The Contractor shall create and maintain records of ALL Government property accountable to the contract, including Government-furnished and Contractor-acquired property.

Regardless of $$ value!!!

physical inventory
Physical Inventory
  • Physically locating and counting Government property?
  • Comparing the results to the records?
  • Posting the findings and adjustments?
  • Reporting the adjustments to the PA (ND and DCMA)?
subcontractor control
Subcontractor Control
  • Important!!!
    • The flow down of proper clauses, provisions, and requirements, e.g., the requirements of the GP Clause FAR 52.245-1.
    • Proper liability provisions- either the FULL risk of loss or the LIMITED risk of loss requirements depending upon the type of contract, listings of GFP, etc.
    • The adequacy of the prime contractor’s system of surveillance incorporated in its PMS and applied throughout the life of the subcontract.
relief stewardship liability
Relief Stewardship (Liability)
  • Disposition
    • LTDD(Loss, Theft, Damage, Destruction) incidents been reported IAW 52.245-1?
  • Cannibalization-NOT the eating of human flesh
  • Shipping
    • Proper paperwork documented? (DD Form 1149)
utilization
Utilization
  • Storage
    • GP separate from NON GP??
    • Adequate facilities? (Temperature, size, security, labeled, etc.)
  • Consumption-materials
    • Disclose and report if in excess of contract performance?
  • Movement
    • Contractor moving GP that is authorized only under the contract it’s authorized for?
maintenance
Maintenance
  • Identification, disclosure, and performance of normal and routine preventative maintenance and repair?
  • Disclosure and report to the Property Administrator the need for replacement and/or capital rehabilitation
  • See the difference?
property closeout
Property Closeout
  • Reporting, investigating, and securing closure of all LTDD (Loss, Theft, Damage, and Destruction) cases.
  • Physically inventorying all property upon termination or completion of the contract.
  • Disposing of items at the time they are determined to be excess to contractual needs.
relevant far property clauses
Relevant FAR Property Clauses
  • 9.104-1 (e) Ktr must have adequate systems
  • 30.201 Cost Accounting Standards (disclosure statements)
  • 31.201-2, -3 &-4 Determining reasonableness, allowability and allocability
  • 45.104&107 Which property clause to use
  • 52.244-2 Subcontracts (ACO approval requirements to subcontract)
relevant far property clauses1
Relevant FAR Property Clauses
  • 52.245-1 Limited risk of loss
  • 52.245-1 Alt 1
  • 52.245-9 Use and charges
relevant dfars property clauses
Relevant DFARS Property Clauses
  • 245.107 When to use DFARS property clauses
  • 252.211-7007 Reporting GFE in the DoD IUID Registry (JANUARY 2014!!!!) Word Document
  • 252.245-7001 Tagging, labeling, and Marking of GFP
  • 252.245-7002 Reporting Loss of GFP
  • 252.245-7003 Contractor PMS Administration
  • 252.245-7004 Reporting, Reutilization, and Disposal
  • 252.242-7004 Material Management and Accounting System