1 / 16

Alumni Gift

Alumni Gift. Classes of:2002-2006. Cut-Away of V-Ball Court. 9ft Poles. Sand. Weed Netting. Drainage Tile. Concrete Anchored Poles. Gravel. Changes to Court. Court size increased for more run off area Masonry sand used (no clay to clump up)

pierce
Download Presentation

Alumni Gift

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alumni Gift Classes of:2002-2006

  2. Cut-Away of V-Ball Court 9ft Poles Sand Weed Netting Drainage Tile Concrete Anchored Poles Gravel

  3. Changes to Court • Court size increased for more run off area • Masonry sand used (no clay to clump up) • Drainage tile added (drains to front yard) • Deck added to side of house • Bench w/storage area against house • Stairs added to previous deck • Foot wash area added (w/ spigot and drain) • Cobble stone added between court and parking lot

  4. Deck Addition

  5. Bench Addition A new place for Bucky to pass out!

  6. Stair Addition Ledge for drinks

  7. Foot Wash Station

  8. Cobble Stone

  9. We would like to thank Shane Finneran, Luke Martin Gene “Shotgun” Reswebber and all the other undergrads who took Time out of there schedule to help make this possible.

More Related