1 / 42

WisDOT’s Statewide Traffic Operations Center

WisDOT’s Statewide Traffic Operations Center. WisDOT STOC - Overview. The mission of the STOC is to manage congestion and improve transportation safety, mobility, and efficiency on Wisconsin’s state highways. Operate traffic management and traveler information systems on WI highways

pearl-brock
Download Presentation

WisDOT’s Statewide Traffic Operations Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WisDOT’s Statewide Traffic Operations Center

  2. WisDOT STOC - Overview The mission of the STOC is to manage congestion and improve transportation safety, mobility, and efficiency on Wisconsin’s state highways • Operate traffic management and traveler information systems on WI highways • 24 hr / 7 day a week / 365 days a year • “Call Center” staffed by STOC Operators

  3. STOC 2009 Org Chart

  4. STOC - Monitor Traffic Conditions • System detectors are used to collect speed and volume data • Data collected is used to create travel times and populate system congestion map • Currently piloting probe technology: • Fleet-based solution

  5. STOC - Monitor Traffic Conditions • Direct link to the Milwaukee County Sheriff’s Office computer-aided dispatch (CAD) • Incident details populate into STOC database and display on a congestion map • Direct link to the State Patrol CAD • Planned for May 2009 • Closed Circuit TV (CCTV) Camera images monitored by STOC Operators and used to locate traffic incidents • Milwaukee, Madison, GB, FDL, Wausau • Access to IL Tollway Video

  6. STOC - Manage Traffic Congestion • Ramp Meters - Used to regulate traffic entering the freeway

  7. STOC - Traveler Information • Provide travel times, congestion, incident and/or special event information via: • Dynamic Message Signs • Portable Changeable Message Signs (JamLogic) • Highway Advisory Radio • WisDOT Web Site • 511

  8. 511 - Overview • 511 provides real-time traveler information services on the state’s major highways, including the Interstate system • Utilizes an interactive voice recognition (IVR) phone system and Web site • Provides incident reports, lane closure information, winter road conditions, and travel times • Initially focusing on the Milwaukee area • Expanding to Madison and Wausau over the next year • Also provides transfers to transit services, State Patrol, County Sheriff Departments, airports, DMV, and other state’s 511 systems • Emergency alert feature allows all users (or only users in a targeted area) to hear a special message – i.e. AMBER alerts or emergency weather closures

  9. WisDOT 24/7 Response Capabilities • If a highway dept or law enforcement agency needs to contact WisDOT, they can call: 1-800-375-7302 • Operators working at the STOC answer the call • STOC makes notification for WisDOT response • Some examples include: signal knockdowns, bridge hits, flooding, and traffic incidents • STOC should be contacted for any incident anticipated to have at least one state highway lane/ramp blocked for greater than 30 minutes • NOT for general public use

  10. Lane & Ramp Closure System An overview of the new features and a look at common closures.

  11. LCS Objectives • Web-based system used to track closures and restrictions on Wisconsin state highways • Archive LCS data in the WisTransPortal system for future analysis and integration with other WisDOT / TOPS Lab traffic engineering applications and research • Facilitate data sharing with WisDOT applications that require lane closure data, such as 511 Traveler Information, Inconvenience Map production and Oversize/Overweight (OSOW) permitting • Improve the completeness, reliability, and timeliness of lane closure data on state highways • Integrate historical traffic flow data and capacity information to calculate available closure thresholds

  12. Benefits • Coordinates activities to reduce back-ups and potential conflicts • Multiple activities can utilize the same closure • Avoid lane closures during a special event • Avoid conflicting lane closures on same highway • Eliminates duplications and inefficiencies by streamlining information into one system • Provides link to historical data that can be used to make informed decisions

  13. System Use • What closures should be tracked? • All let projects (information formerly entered into Traffic Impediment Module) • Any planned maintenance or permit / utility work closure or restriction on: • IH & USH • Major state highways (Corridors 2030, 4-lane +, detoured closures) • Emergency Closures (I.e. closures that are the result of an unexpected incident, such as a bridge hit or flooding, that result in the roadway being closed for an extended period of time) • All major special events • When should closures be entered? • 14 days - Project start or full roadway closure • 7 days - System ramp closure • 3 days - Lane and service ramp closure

  14. User Roles • LCS User Roles • Administrator • Supervisor • Regional Traffic Engineer (RTE) - Regional Coordinator • Statewide Traffic Operations Center (STOC) • Project Manager (PM) • Permit Coordinator (PC) • Maintenance Coordinator (MC) • Project Leader (PL) • Inspector (INSP) • Requestor (REQ) • Viewer (VIEWER) • System can be accessed via the Internet – therefore people outside of WisDOT can log on with a username and password

  15. A note on entering • When entering closures, please remember: • Specific closure information must be used when entering data into the LCS. • A two month period indicating a roadway may be closed occasionally is not acceptable • For rolling closures, a specific date and time period should be entered • The location should be identified using the anticipated start and end point of the segment where the closure will take place • Full roadway closures must be entered directionally • One closure will be made for each direction

  16. Acceptance Process Closure Request Return / Reschedule Forward Accept Complete

  17. Acceptance Process Continued • When entering closures, please remember: • A WisDOT Regional Traffic Supervisor (RTS) must accept all freeway and expressway closures. • If a RTS is unavailable, Regional Operations Managers should make approval • Maintenance or project related staff should not be granted acceptance authorization • WISDOT PDS, Traffic, and Maintenance Supervisors should review closure information entered and accepted by staff with proper authorization on a weekly basis • It is important that closures be entered in accordance with the advanced notification guidelines previously outlined to allow adequate time for approval • Enhancements have been made to better facilitate the acceptance process • Acceptance authorization will only be allowed by the Traffic Supervisor for all freeway closures.

  18. Data Accuracy & Completing Closures • It is critical that all closure information entered in the LCS be accurate • The closure information entered in the LCS is used to: • Provide traveler information through WI’s newly established 511 phone system and website (www.511wi.gov), where data accuracy will have a direct impact on the public’s perception of the value of the system • Issue OSOW permits, which has a direct impact on the movement of commerce through WI • Any closure entered for more than 14 days must be manually completed • This requires a user to enter the LCS and complete the closure • A closure will continue to be reported until checked complete • Closures less than 14 days will automatically discontinue reporting

  19. Special Events • Special event information can be viewed within the LCS • Event information should be checked when scheduling closures to identify conflicts • The regional traffic section is responsible to enter special events that may impact traffic and are of concern when scheduling closures • This activity should be coordinated with the Regional Communication Managers • At a minimum, events should be entered into the LCS by the 15th of every month. A report of all the events will be distributed to all PDS and Ops Supervisors

  20. Special Events Continued • The Calendar Interface allows users to check for events prior to requesting a closure

  21. Special Events Continued • Users can also check on Special Events in the Accept & Modify Interfaces before accepting or editing a closure

  22. Web Address http://transportal.cee.wisc.edu/closures

  23. Request - General Section New • Disappearance of the duration drop down. • Disappearance of the External Comments • New naming scheme • Primary and Secondary contacts phone numbers will automatically populate Old

  24. Request - Facilities Section New Old • The duration drop down is now in the facility section of a closure

  25. Closure Duration • Daily/Nightly: closure occurs on a daily or nightly basis as specified by the starting and ending times per each day within the start date and end date range. • Continuous: closure is more than 24 hours but less than 2 weeks. • Long Term: closure more than 2 weeks.

  26. Duration – Long Term • Long Term closures no longer have a timeframe associated with the dates of the closure.

  27. Duration - Weekly • Weekly: re-occurs on a weekly basis as specified by the day of week dropdowns • New DOW location to make it easier to distinguish between the beginning and end days.

  28. Accept Interface Old • Can now search on a highway, not just a single direction • Project ID or Closure ID searches will override other parameters • Can search for multiple CID’s at a time • CID’s must be separated by comma or dash for a range and text field must be less than 35 characters New

  29. Modify Interface • Modify has been changed to “Edit” to avoid confusion with it’s function. • Closures longer than 14 days are changed to complete from the Modify Interface.

  30. Searching Changes • Formatting changes have been made to the Accept, Modify, and Search interfaces • Overall speed of searches improved though all interfaces • Printable All makes it easier to print multiple closures • CSV (comma separated values) allows users to export data into an Excel file.

  31. Reports Interface Old • Many changes to the Reports Interface • Focus on active closures • Ability to lookup closures that only have OSOW restrictions • Recently modified searches • Again can narrow by Project ID or CID New

  32. Closure Walk Through • General screen filled in with all pertinent data • The more information entered, the easier it is to make contact with closure personnel

  33. Closure Walk Through Type of facility (mainline, ramp, bridge or system interchange) Duration type (daily/nightly, weekly, continuous or long term) Closure is either a closure or restriction What’s closed (single lane, left shoulder, left lane, 2 left lanes etc..) If the closure location is not listed, find the closest point and give a direction and distance from Closure location OSOW Restrictions (place any restrictions that OSOW will use when creating routes / issuing permits) If a full closure is selected, a detour route will need to be entered Other useful information about the closure should be placed in the external facilities box If more than 1 facility will be needed, the add facility button will allow for multiple entries

  34. Closure Walk Through • Here a single lane will be closed for one week, from 9 am to 2 pm • Be as precise as possible with the start & end time as-well-as with the begin and end locations

  35. Closure Walk Through • A Weekly Duration is a closure that will start on Monday at 9am and be picked up on Friday at 2pm, for three weeks in April • This Continuous closure duration will be active from Friday the 3rd at 9pm and be picked up on Monday the 6th at 6am • This long-term closure will take place for the entire month of April When all the information is entered, submit the closure for review/acceptance

  36. Closure Walk Through • If work will be done in the opposite direction, the MakeLike link will auto fill the General section of the closure • User will have to change the Hwy Direction

  37. Closure Walk Through • The Edit button is where changes can be made to a live closure • Used when the new date/time are known • Rescheduled requires re-acceptance • Used when date/time are unknown

  38. Closure Walk Through • This long term closure will need to be “completed” when the work is finished • For closures with a single or multiple facilities, use Complete All button • A closure that has multiple facilities but only 1 is complete, use the facility-specific complete button All closures lasting longer than 2 weeks need to be completed, regardless of the closure type (daily/nightly, weekly, continuous or long term)

  39. Common Mistakes • Closures cannot be entered with a “vague” definition of when a lane closure may happen • Must be entered with specific dates & times • Unless the closure is truly long term

  40. Common Mistakes • Closures cannot be entered with no begin and end time defined

  41. Forgot Password • If a user lost his/her password, the user can follow the “Forgot Password” link to have their password reset

  42. Contacts • For username/password questions, email: wislcs@topslab.wisc.edu • For questions about missing construction Project IDs, email: wislcs@topslab.wisc.edu • For additional questions about WisLCS reporting procedures, contact the WisDOT State Traffic Operations Center: Scott Kozlik Doug Dembowski Lead Operator Supervisor Phone: (414) 227-2161 (414) 227-2149 E-mail: scott.kozlik@dot.wi.govdouglas.dembowski@dot.wi.gov • WisDOT STOC 24-hour phone number: (414) 227-2142

More Related