110 likes | 211 Views
Design Study “EDM”. NuPECC Meeting Edinburgh. October 10, 2014 | Hans Ströher (Forschungszentrum Jülich). Novel precision storage rings for Electric Dipole Moment searches. CP Violation by EDMs. Electric Dipole Moments violate P- and T- invariance. Spin. EDM. +. +. T. -. -.
E N D
Design Study “EDM” NuPECC Meeting Edinburgh • October 10, 2014 | Hans Ströher (Forschungszentrum Jülich)
Novel precision storage rings • for Electric Dipole Moment searches
CP Violation by EDMs Electric Dipole Moments violate P- and T-invariance • Spin • EDM + + • T - - • Original illustration by: physicsworld.com Via CPT theorem, T-violation correspondstoCP-violation
Science Case The matter-antimatter asymmetryoftheuniverse: Whatweshouldsee: Whatweactuallysee: equalamountofpredominantly matter matter and antimatter almostno antimatter • Ratio • 1010 :1 • Matter • Anti- • Matter This isoneofthebigunsolvedproblems in physics !
Source(s) of EDMs Multiple experimental inputisrequired … … todisentanglethe fundamental source(s) of EDMs
Principle of EDM Search Particlespinalignmentalongmomentum (frozenspin) Radial E-field: torque on spin – rotation out of ring plane
Frozen Spin Technique Left: a polarizedchargedparticle (beam) in a storage ring • Spin • Momentum • Proton: • „all-electric (E) ring“ • magic momentum • Proton, Deuteron, 3He: • „all-in-one (E-B) ring“ • variable momenta Right: fixingthe horizontal spinalongthemomentumdirection
Project impact EDM searchesaremust-doexperiments The EDM Storage Ring will be a European flagshipproject! • Technology • New storage ring design • Beyondstate-of-the-art • equipment • Physics • Search fornewphysics • Matter/antimatter puzzle • Complementaryto LHC • Society • Capacitydevelopment (training, education) • International scientificcooperation • Cooperationwithhigh-techindustry
Design Study WP6: Ring Layout WP3: Electrostatic Deflectors WP4: Beam Instrumentation WP5: Beam Polarimetry WP2: Dissemination ofresults WP1: Consortium Management
Design Study WP6: Ring Layout Concept: useofclockwiseandcounter-clockwisebeams (falseeffectssystematicerrors) Proton: „all-electric ring“ onevacuumchamber Proton, deuteron (3He): „E-B ring“ separate beams
Participants • 42 months, 2.8 M€ (personnel only) • Deliverable: CDR for storage ring