palila
Uploaded by
5 SLIDES
245 VIEWS
50LIKES

4DTRAD Progress Report

DESCRIPTION

4DTRAD Progress Report. SC214_WG78 Plenary9. 4DTRAD Progress Report. Day 1: position papers agreements Changes to ADS-C EPP Note to fields gross mass and predicted gross mass at TOD added Field O added with notes: o) Min/max speed schedule (optional capability)

1 / 5

Download Presentation

4DTRAD Progress Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4DTRAD Progress Report SC214_WG78 Plenary9

  2. 4DTRAD Progress Report Day 1: position papers agreements • Changes to ADS-C EPP • Note to fields gross mass and predicted gross mass at TOD added • Field O added with notes: • o) Min/max speed schedule (optional capability) Note: The above data would be used by the ground system to assist in providing a solution to compute ETAmin/max. Either min/max speed schedule or min/max ETAs downlink must be made mandatory after the validation process. • Field P added with notes: • p) trajectory intent status data (optional capability)

  3. 4DTRAD Progress Report Day 1: position papers agreements • New contract definition • ETA min/max (Provides Minimum and Maximum estimated times of arrival at the requested waypoint) (optional capability) • a) Maximal estimated time of arrival • b) Minimal estimated time of arrival Note: The above data would be used by the ground system to assist in providing a solution to compute ETAmin/max. Either min/max speed schedule or min/max ETAs downlink must be made mandatory after the validation process. • We keep the ANEX C in the document • All changes coordinated with ADS-C group.

  4. 4DTRAD Progress Report Day 2: comments resolution • Closed 31 (document changed) including all showstopers • Working 5 (document to be changed) • Deferred 1 (validation discussion) • Rockwell Colins: necessity of vertical waypoint types in EPP needs to be analysed as part of the validation as it will be difficult to support those with some low-end FMS products. • Rejected 1 • Open 87 (mainly editorial) • Work required after the meeting

More Related