Joint Industry Program on oil in Ice.Oil spill contingency for Arctic and ice-infested waters Kick Off Meeting Trondheim September 20th – 21st 2006 Stein Erik Sørstrøm SINTEF
September 20th 2006 0930 OPENING 0940 PROGRAM PRESENTATION Stein E Sørstrøm 1000 CHALLENGES; Sveinung Løseth, NTNU 1020 BASIS FOR FURTHER WORK Ice regimes, Øistein Johansen, SINTEF Weathering , Per J Brandvik Oils for testing, Janne L M Resby, SINTEF 1200 LUNCH 0100 COMBAT METHODS Mechanical recovery, Ivar Singsaas, SINTEF Chemical oil spill combat, Per S Daling, SINTEF In situ burning of oil on sea /in ice infested waters, Ian Buist, SL Ross/Per J Brandvik, SINTEF Monitoring, Dave Dickins. 0245 pm Coffee break 0300 TESTING AND VERIFICATION, Lab, meso and field. Per J Brandvik, SINTEF 0400 PROJECT PLANS All project managers, max 20 min each 0730 pm DINNER, RICA Nidelven Hotel September 21st 2006 0930 GENERIC GUIDELINE. Ivar Singsaas, SINTEF 1015 COOPERATING ORGANISATIONS, IN-KIND SUPPORT, Stein E Sørstrøm, SINTEF 1045 PRACTICAL INFORMATIONStein E Sørstrøm, SINTEF web + eroom, Upcomming workshops, Miscellaneous 1130 LUNCH 0100 PARALLELL SESSIONS Steering Committee meeting, SINTEF Sealab 3rd floor Further scientific discussions Site visit (laboratories and test facilities) 0300 end AGENDA
Pre-project • Pre-project initiated in October 2005, to: • Prepare a short state-of-the-art report • Define R&D needs and partners • Prepare a draft Joint Industry Program (JIP) proposal • Perform a workshop to finish the proposal and plan the way forward • Prepare final JIP proposal Financed by: Chevron, ConocoPhillips, Shell, Statoil and Total AGIP joined the program in 2006
Workshop Oslo, 4 and 5 April 2006 Presentation of State of Art-report Suggested activities in the JIP proposal Oil spill response challenges in selected ice-infested waters: Alaska, Lee Majors, ACS East Russia, Sergei Pokrashenko, SEIC-HSES Canadian Beaufort, Ian Denness, ConocoPhillips North-West Russia, Gennady Semanov, CNIMF Caspian Sea, Mark Shepherd, Agip KCO Individual presentations of mechanical recovery equipment Foilex, FRAMO, Lamor, Vikoma, Desmi/Ro-Clean, Presentation of main tasks and activities The way forward, plan for initiation and accomplishment, Pre Kick Off, June 29th 2006 Trondheim 3 companies present, 2 companies on phone, 1 unable to participate. it was agreed to initiate some activities before the kick-off meeting. a draft contract proposal was sent to the participating oil companies. 6 cooperating organisations were invited to join the program Kick off and Steering committee meeting scheduled for September 20.-21. 2006. Previous meetings in 2006
JIP Oil in Ice.Overall objective • Develop tools and technologies for oil spill response for ice-infested waters • The program will • Improve our ability to protect the Arctic environment against oil spills. • Improve the basis for decision-making • Advance state-of-the-art in Arctic oil spill response by • Addressing key problems/scenarios • Demonstrating response options for different ice conditions and oil types • Defining limiting conditions for various response strategies • Developing improved response capabilities and strategies
Fate and behaviour of oil under Arctic conditions In-situ burning in Arctic and ice-infested waters Mechanical recovery in Arctic and ice-infested waters Use of chemical dispersants in ice-infested waters Monitoring and remote sensing Field experiments at Svalbard and in offshore ice-infested waters Preparation of a generic oil spill contingency plan /guideline Coordination, management, communication and publishing 8 projects 21 tasks 6 oil companies 6 cooperating organisations R&D organisations Suppliers of equipment Authorities Program overview
Coordination, managment and communication. BASICINPUT Fate and behaviour Compiling recent weathering data Modification/upgrading of OWM Meso-scale weathering (laboratory Long term experiments (Svalbard) Large-scale field verification • ”COMBAT METHODS” • In-situ burning: • Burnability as a function of weathering • Field test of herding agents • Testing of fire-resistant booms • Oil weathering model upgrading on burning • Mechanical recovery: • Testing of existing recovery systems • Development of new concepts and units • Use of dispersants: • Effectiveness by use of dispersants • Improved application technology DETECTION, MAPPING. Monitoring and remote sensing: Development/testing of remote sensing system Testing SGS LightTouch Verification of airborne LFS Circumpolar description of ice regimes • LAB, MESOSCALE AND FIELD EXPERIMENTS AND TESTS • Experiments at Svalbard, 2007 and 2008 • Offshore field experiments, 2007 and 2009 Generic oil spill contingency plan/GUIDELINE Develop knowledge, tools and technologies for oil spill response for ice-infested waters
Steering Committee Oil Companies Agip KCO Mark Shepherd Chevron Norge AS, Gunnar H Lille Norske ConocoPhillips AS, Eimund Garpestad Shell Technology Norway A/S, Gina Ytteborg Statoil ASA , Hanne Greiff Johnsen Total E&P Norge, Ulf Einar Moltu Program coordinator; Stein E Sørstrøm, SINTEF Cooperating Organisations NOFO, Hans V Jensen Alaska Clean Seas, Lee majors Norw. Coastal Admin., Johan M. Ly MMS, Joe Mullins OSRI, Katey Walter CRRC, Amy Merten R&D Organisations SINTEF Dave Dickins Associates S L Ross PROJECTS. Fate and behaviour, In-situ burning Mechanical recovery Use of chemical dispersants Monitoring and remote sensing Field experiments Generic oil spill contingency guideline Coordination Organisation
Time schedule Pre-project Lab/basin/field experiments and tests Full scale field trial 2005 2006 2007 2008 2009
Cooperation with local organisations and/or oil companies. Where we can Support the local work on oil spill contingency by sharing information Get relevant input and experience for the JIP-work through site visits / field visits May be in connection with already planned / scheduled local meetings, conferences, workshops, field experiments and/or test. We would need some local support; Accomodation Local transport (field / site visits) Meeting rooms Suggestions regarding program, site visits, possible local / regional partners Planning takes time We need to establish the plan for the workshops as soon as possible. Workshops
Draft agenda for workshops • Day 1. • Arrival in the afternoon (before 0600 pm) • Presentation of plans / program for the workshop • Presentation of local activities. • Dinner • Day 2 • 0800 am – 0500 pm Site visit • 0500 pm – 0700 pm SC meeting • Dinner • Day 3 • Presentations from the program • Further plans • End approx 4 pm
WEB Open to public Contents Presentation of participants Oil companies R&D organisations Cooperating organisations Other partners Presentation of program Objective Plans Presentations Results. Qualified results open to the public. Workshops and seminars Program Invitation Registration Information on oil spill in ice - research and development Other? E-ROOM Requires username and keyword Contents Administration Contractss Plans Status reports Steering Committee SC meetings Minutes Program overview Project by project Reports Presentations Project plans Workshops Program Presentations Logistics Database Progress and results status reports project / task plans Discussion Other? WEB and E-ROOM