An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUXIN Biogas Plant 4, 6 and 10 m3 family-size

  2. (1) Introduction of PUXIN Biogas Plant technology • To renovate the traditional fixed dome biogas plant, Shenzhen Puxin Science& Technology Co., Ltd, through many year’s study developed a new generational hydraulic biogas Plant-the PUXIN Biogas Plant that has carried on almost all the advantages of the traditional fixed dome biogas plant, and overcome its main disadvantages. • By the end of 2012, PUXIN biogas plant has been extended to over 50 countries.

  3. 6m3 PUXIN biogas system

  4. 10m3 PUXIN biogas system

  5. Family size PUXIN biogas plants built in Kenya

  6. Family size PUXIN biogas plants built in Ghana

  7. Family size PUXIN biogas plants in construction Spain

  8. Family size PUXIN biogas plants in construction in South Africa

  9. A.The structure: • PUXIN Biogas Plant is mainly composed of a concrete digester and a glass fibre reinforced plastic gas-holder.

  10. The digester is 2.4m deep, 2.8m in diameter and 6m3 of capacity. The gas-holder is 1.6 m in diameter, 0.6 m high and 1 m3 of capacity.

  11. B. Main advantages Comparing with the fixed dome biogas plant, the PUXIN biogas plant has the following distinct advantages: • Easy and quick to be built • High gas production rate • Easy to maintain • Durable

  12. 1. Easy and quick to be built • Any working mason through one day’s study is able to build the PUXIN Biogas Plant with 100% success rate. • The construction of a PUXIN Biogas Plant can be completed within 48 hours.

  13. The process to build PUXIN biogas plant 2. Cast the basement and assemble the stomach mould 1.Dig a hole in the grand 3.Assemble the vault mould 4.Cast the digester stomach

  14. 5.Assemble the neck mould. 6.Cast the digester neck 8.disassemble the vault and stomach mould 7.disassemble the neck mould.

  15. 10.Install the gas holder 9.Build the inlet and outlet 11.Install the gas pipe system and the appliances

  16. Contrast of the technical requirements for the builders

  17. Contrast of the construction period

  18. 2. High gas production rate • It has been proved that the gas production rate of PUXIN biogas plant is over 50% higher than that of the traditional fixed dome biogas plant in average under the same conditions. • In TIMOR LESTE a 10m3 PUXIN biogas plant with three 1.2m3 gasholders can produce enough gas for three families.

  19. The president of TIMOR LESTE is visiting a PUXIN biogas plant built in TIMOR LESTE

  20. 3. Easy to maintainThe leak of the gas-holder can be found immediately, and can be repaired on ground

  21. Contrast of the maintenance

  22. 4. Durable • The concrete digester can last over thirty years. The glass fibre reinforced plastic gas-holder can last over ten years. When the gas-holder is worn-out, a new one can replace. So the PUXIN biogas plant can last over thirty years.

  23. (2) Cost analyze of a 6m3 PUXIN biogas plant(the earth work is not included)

  24. Products related to PUXIN family size biogas system • Steel mould • Glass fibre reinforced plastic gas-holder • Biogas appliances

  25. 1. Steel mould The 10m3 steel mould can build 4, 6 and 10m3 PUXIN family size biogas plants.

  26. 2. The gas-holder • This product is one of the main components of PUXIN Biogas Plants. • On the top of the gas –holder there is a valve that can eliminate the atmospheric pressure. • When there is a need to replace solid fermentation material like straw in the digester or to repair the digester, the gas-holder can be taken out from the digester easily.

  27. Gas-holder

  28. 3. Biogas appliances • biogas stove • biogas water heater • biogas rice cooker • Biogas lamp • Biogas pipe & fittings • Biogas generator

  29. Biogas stove (double burners)

  30. Biogas water heater (7L)

  31. Biogas rice cooker (2L)

  32. Biogas lamp

  33. Biogas pipe & fittings • biogas pressure age • biogas desulfurizer • biogas pipe fittings • biogas pipe • biogas flow meter

  34. Biogas generator (1-5kw)

  35. (4) References

  36. 1. East Timor • In East Timor the biogas system composed of 10m3 Puxin family size biogas plant and two extra gasholders is a very popular biogas system that provide enough biogas for three families for their daily cooking and water boiling. • Contact: • Mr. Aries Eddie de Almeida • Phone: +670-7242748 • E-mail: dalmukelect@gmail.com

  37. 2. Ghana Many biogas systems composed of numbers of 10m3 PUXIN biogas plant are built for schools and hotels to treat the sewage water and food waste. Contact BETA CONSTRUCTION ENGINEERS LIMITED P. O. BOX K.I.A. 9329 ACCRA- GHANA Contact person: Mr. Kofi Ahenkorah Phone: 233-21-404186, 233-24-6865689/4239539 FAX: 233-21-404186 E-MAIL: betaconst@yahoo.com

  38. 3.Nicaragua Puxin biogas system built in Polytechnic University of Nicaragua to treat the food waste, the biogas for cooking. A 50M3 Puxin biogas systems built in Juigalpa Nicaragua to treat the slaughterhouse waste, The biogas used in a water heater using in slaughter pigs process, the Project support by UNIDO. Contact Polytechnic University of Nicaragua Contact person: Dr. Roberto A. González Phone: 2249-4529, Fax 2249-9232 E-mail: roberto.gonzalez@upoli.edu.niroberto_glezc@yahoo.esrobertoglezc@tmail.com

  39. 4.Kenya Puxin biogas system built in Kenya Contact Kenya Puxin Renewable Energy Co. Ltd. Nairobi office: Veteran hse, 8th floor, suite 807. Along moi avenue. Branch office: Jopa hse, suite 2. P.O BOX 1051, 20300. Nyahururu. Contact person: Ms.Martha kagiri Phone: +254727980192, Mobile: +254703632974 E-mail: marthapleijel@yahoo.semarthapuxin@gmail.comkenyapuxin07@yahoo.com http://www.puxinbiogaskenya.kbo.co.ke

  40. 5.South Africa Puxin biogas system built in South Africa Biogas SA PO Box 864 Muldersdrift Johannesburg 1747 South Africa Contact person: Mark Tiepelt Phone: +27 72 445 4739 http://www.biogassa.co.za

  41. 6. Israel Puxin biogas system built in Israel Contact Ecogas Israel Derech hayam 10, Michmoret, Israel, 40297 Contact person: Oshik Efrati Phone: +972-(0)52-3221554 Fax: +972-(0)57-9557509 E-Mail: oshik@ecogas.co.il http://www.ecogas.co.il

  42. 7. Senegal Puxin biogas system built in Senegal Contact BIOECO St. Louis 221, Senegal Contact person: Christophe Chesneau Phone: +221-773381210 E-mail: c_chesneau@yahoo.fr

  43. 8.WFP 400 sets of PUXIN family size (10m3) biogas plants were purchased by WFP for Sudan in 2011. Contact: Hamed Adlan, Procurement Unit, WFP Khartoum, Sudan Email: Hamed.Adlan@wfp.org, tele: +249912153007 Firas Dabbagh, Procurement Officer, WFP-Sudan RO, VSAT: 2231 Email: Firas.Dabbagh@wfp.org , tele: +249 9121 77319 Mr. Amit Kumar Singh , Programme Officer , United Nations World Food Programme North Darfur Area Office, North Darfur,Sudan , Mobile- 00249 912317841 Email: Amit.Singh@wfp.org

  44. 9. UNIDO 2 family size biogas system formed by 2 sets of 10m3 biogas plant and 2 extra gas holders were purchased by UNIDO for Armenia in 2012 Contact : Dr. Victor Afyan, Apt.16,Charents, Block,15, Avan, Yerevan, 0060, Armenia Email: vafyan@contact-a.am Tel: (374)-98-411-453 Ms. Gillian OCAMPO-GOETZLINGER<G.Ocampo-Goetzlinger@unido.org>; 'DRAECK, Mark'<M.Draeck@unido.org>; ORLOV, Alexander<A.Orlov@unido.org>; SIMONYAN, Anahit<A.Simonyan@unido.org>;

  45. Contact us

  46. If you have the interest please contact: • Shenzhen Puxin Technology Co.LtdAdd: 2nd floor, Bldg 4, 49 Jiaoyu North Rd, Gaoqiao District, Pingdi Street, Longgang, Shenzhen, P. R. China • Postal Code: 518117 • Tel: 86-755-28938251  86-755-28938252Fax: 86-755-89323983 E-mail: JW@puxintech.com • Website: www.puxintech.com