FRENCH MULTIPARTNERSHIP (Alcatel, Astrium, CNES, EADS, Thales). OBJECTIVES Improve synergy between different actors in the space sector Pool individual efforts for innovative, vital activities Propose a joint policy on sensitive issues
E N D
FRENCH MULTIPARTNERSHIP(Alcatel, Astrium, CNES, EADS, Thales) OBJECTIVES • Improve synergy between different actors in the space sector • Pool individual efforts for innovative, vital activities • Propose a joint policy on sensitive issues • Increase the efficiency of our activities, consolidate our expertise • Share risks • Avoid redundancy
FRENCH MULTIPARTNERSHIP PRINCIPLES / IMPLEMENTATION • No exchange of funds (exchange of research studies, of test reports, manpower, test facilities etc.) • Annual adoption of the Action Plan with its related budgets and assignments • Each partner commits himself to implement all the means necessary to carry out the Action Plan • The multipartnership centres around a “Multipartnership Group” and a “Steering Committee”
Components, Assembly & PackagingFrench Multipartnership (ASPI, Astrium, CNES, EADS, TH) Steering Committee (Board of Directors) Multipartnership Group • Year Plan Activities (Resp., Funds, Sched., …) • Tasks List • Common Parts List • Planned Works on CPL • Exchanged Reports List • Budgetary synthesys Sub Groups Component Policy Radiations Reliability Assembly & Packaging
FRENCH MULTIPARTNERSHIP MISSION OF THE MULTIPARTNERSHIP GROUP • Put forward a joint Action Plan with corresponding budgets and deadlines • Carry out or have the Action Plan carried out • Suggest a joint policy for sensitive issues • Present an annual synthesis to the Steering Committee • Ensure that partners work smoothly together • Seek amicable settlements to any disagreements • Vote on decisions • Composition: 1 representative from each company, 2 to represent CNES • Chaired by CNES • Meet every 3 months (or more frequently if so required) : 27 meetings since beginning of 1998
FRENCH MULTIPARTNERSHIP MISSION OF THE STEERING COMMITTEE • Annually approve: • Action Plan • Amount and distribution of related contributions • Accept any new partners • Find solutions for any disagreement not already settled by the Multipartnership Group • Pronounce the exclusion of a Partner if necessary • Composition: 1 representative from each organisation • Technical secretariat tasks fulfilled by the Chairman of the Multipartnership Group • Chaired by CNES • Meet annually, or more frequently if so required (7 meetings)
FRENCH MULTIPARTNERSHIP EXCHANGING RESULTS, PUBLICATIONS, CONFIDENTIALITY • Immediate and unrestricted dissemination of results between parties for their own needs • Action Plan and contents of Actions in the form of a task list which can be published straight away and without any restrictions • Study and test reports can be published after 12 months (or less if the Group so decides on a case by case basis) COMING INTO FORCE, DURATION, CANCELLATION • Comes into force on acceptance by the Steering Committee (1st Committee meeting) • Duration: 1 year, renewal by tacit agreement • Six months’ notice prior to withdrawal (assuming work undertaken has been completed) • Steering Committee can pronounce the cancellation of the Multipartnership agreement
French Multipartnership : Basic Activities Prospective,State of the Art Needs Identification Lessons Learnt Common Parts List R & D Studies Multipartnership Work linked to Common Parts List New Component Policy
French Multipartnership : Basic Trades involved Environment /Radiations / Hardness Family Expert Product Assurance Construction & Failure Analysis Procurement Multipartnership Assembly &Packaging Reliability Designer
French Multipartnership 1998 to 2002 Plans :Synthesis of Main activities (1/3) • Studies • Prospective / State of the Art of COTS families (Practical exercises) • Selection and procurement methodology for COTS • Validation of the methodology • COTS policy and specifications • Humidity requirements • Temperature uprating • Deratings for COTS • Improvement of Test radiation methods • Comparative evaluation of New Components • ... • Testing new components (Common multipartner COTS list) • radiation Characterisations (TID, SEU, SEL, …) • Construction and Failure Analysis • Evaluation test plan, if needed (Life Test, On/Off, …) • Electrical characterisations, if needed • ...
French Multipartnership 1998 to 2002 Plans :Synthesis of Main activities (2/3) • Justification Documents (One document per type) • Identification of Data sources • Manufacturer Surveys • Reliability and quality Data • Component characteristics • Synthesis of testing results (radiation, LT, …) • … • lessons learnt • Airbus data on COTS reliability • improvement of reliability models (MIL/HDBK 217) and use of RDF Model • In Flight Radiation Failures • …
French Multipartnership 1998 to 2002 Plans :Synthesis of Main activities (3/3) • Assembly and packaging • New packages (BGA, CSP, …) • Visual inspection rules for COTS assembly • High density PCB’s • Very high density PCB’s • Quality Problems on DC/DC Converters • Visual Inspection criteria for SMT’s • COTS assembly qualification • Glob Top encapsulation (Non hermetic) • … • RAMS • Improvement of MIL/HDBK217 model • Availability calculation of systems using COTS • Study of RDF model • ...
French Multipartnership 3 years global synthesis • Quelques graphiques
Modules de Gestion / Entrée des Données Sorties / Documents de Travail Gestion Fiches de Tâches Etat d ’avancementTravaux sur ListeCommuneComposants 300 Fiches GestionListe CommuneComposants BdDMultipartenariatComposants(CNES) 300 Ref GestionTravaux Réaliséssur Composants de la Liste Commune Etat d ’Avancement Etudes, Prospectives, ... Synthèses Budgétaires 800 Travaux Gestion Rapportsd ’Etudes, d ’Essais, ... Liste Rapports Diffusés 350 Rapports Multipartenariat Composants : Base de Données French Multipartnership Data Base