1 / 21

Development of Communication and Control (C 2 ) Subsystems

Development of Communication and Control (C 2 ) Subsystems. AIF Research Forum, Fredericton, New Brunswick, May, 19, 2006 Julian Meng and Shane Barnes. Task Description. Development of cost-effective communication and supervisory control technologies for DPG.

odele
Download Presentation

Development of Communication and Control (C 2 ) Subsystems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of Communication and Control (C2) Subsystems AIF Research Forum, Fredericton, New Brunswick, May, 19, 2006 Julian Meng and Shane Barnes

  2. Task Description • Development of cost-effective communication and supervisory control technologies for DPG. • Concentrate on internet access and low-cost point-to-point (multipoint) wireless solutions. • Simple but effective link between Energy Control Center (ECC) and desired DPG device.

  3. DPG Network

  4. DPG C2 Requirements • Requirements: Modular, Reliable, Flexible • Bandwidth: Low, kbps (based on anticipated control requirements) • Distance: Variable • Control protocol: MODBUS compliant

  5. Deliverables • Solutions for short and long distance communication links to form a DPG network. • Hardware and software for communication links. • Control interface: ECC-DPG. • Demonstration of reliable field operation.

  6. DPG Communication System • System components: WAN (Internet), LAN (unlicensed serial radio), Gateway (cellular radio)

  7. DPG Communication System

  8. Scalable Point-to-point Solution • Low-cost unlicensed (900 MHz ISM band) radios for Gateway to DPG link • Maxstream, Microhard, others • Cost: $200 US (low end) to $1500 US (high end) • Can radios achieve performance of stated specifications?

  9. Gateway Solution • Cellular Modems: Airlink Redwing ($500 US) • Low cost wireless access to the Internet

  10. Low-cost Radio Specifications

  11. Test Bench • Performance expectations of low-cost radio solutions must be managed. • Field deployment testing is difficult. • RF test bench was developed to test and validate performance of radios under varying conditions. • Components include: various RF components, spectrum analyser, signal generator and FPGA channel simulator

  12. Test Bench • Performance expectations of low-cost radio solutions must be managed. • Field deployment testing is difficult. • RF test bench was developed to test and validate performance of radios under varying conditions. • Components include: various RF components, spectrum analyser, signal generator and FPGA channel simulator

  13. Test Bench

  14. FPGA-based Channel Simulator Characteristics: • Low-cost • Quick data collection & analysis • Real-time simulation of real-world channel conditions • Critical performance comparison • Problem identification before costly market failure • Re-configurable FPGA for broad range of scenarios

  15. FPGA-based Channel Simulator • Free space loss • Propagation delay and multipath reflections • Additive white Gaussian noise • Multi-access interference • Narrowband interference

  16. PER Sensitivity Performance 9600 kbps

  17. PER External Interference Performance 9600 kbps

  18. MODBUS Protocol Control layer: • Internet based • Open standard • Scaleable • Universal recognition

  19. MODBUS Protocol MODBUS Communication Drive PLC HMI I/O PLC I/O MODBUS on TCP/IP Gateway Gateway Gateway PLC PLC MODBUS on RS232 MODBUS on RS485 MODBUS on MB+ HMI I/O Drive I/O I/O I/O Device Device

  20. Where we are … • Two low-cost P-to-P radios have been bench tested. • Simple Gateway/P-to-P solution was shown to be successful. Meaning: From anywhere in the world where we can access the internet, we can observe/control the DPG conditions. • The selected (as are most) telemetry radios are MODBUS capable to allow for flexibility, interoperability and industry compliance.

  21. Where we need to be … • Communication layer utilization by the application layer i.e. ECC to DPG. • Bench level mockup. • Field testing and validation.

More Related