slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board PowerPoint Presentation
Download Presentation
Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board

Loading in 2 Seconds...

play fullscreen
1 / 28

Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board - PowerPoint PPT Presentation


  • 134 Views
  • Uploaded on

Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board July 16 , 2014. The GBIP in a Nutshell: Approach. Solid guidance from GBIP subcommittee Minor restructuring to address local issues and flow Targeted technical outreach

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board' - oakley


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Gunnison Basin

Implementation Plan

Presentation to the

Colorado Water Conservation Board

July 16, 2014

the gbip in a nutshell approach
The GBIP in a Nutshell: Approach
  • Solid guidance from GBIP subcommittee
  • Minor restructuring to address local issues and flow
  • Targeted technical outreach
  • GBRT assistance with public outreach
  • Avoid duplication of previous efforts
the gbip in a nutshell content
The GBIP in a Nutshell: Content
  • Primary Goal: Protect Existing Uses
  • Focus on Agricultural Shortages
  • Agricultural Shortages = Agricultural Gap
  • Focus on Modeling
  • Tiered & Combined Project List
introduction
Introduction
  • Overview of the Gunnison Basin
    • Layout and Land Ownership
    • Hydrology and Water Management
    • Water Rights Administration
    • Environmental Flow Management
    • Water Quality and Watershed Management
    • Water Related Recreation
    • Economic Impacts of Water Use
  • Overview of the Gunnison Basin Implementation Plan
    • Purpose
    • Outreach Process
    • Report Structure
  • Overview of Available Basin Information
    • Modeling Tools
    • Basin Studies
section 1 basin goals
Section 1: Basin Goals
  • Introduction
  • Basin Goals
  • Statewide Principles
section 2 basin needs
Section 2: Basin Needs
  • Introduction
  • Agricultural Needs
    • Summary of Process
    • Recent Updates (Including Drought Study Impacts)
    • Summary of Needs
  • Municipal and Industrial Needs
    • Summary of Process
    • Recent Updates (Including Drought Study Impacts)
    • Summary of Needs
  • Environmental and Recreational Needs
    • Summary of Process
    • Recent Updates (Including Drought Study Impacts)
    • Summary of Needs
section 3 basin evaluations
Section 3: Basin Evaluations
  • Introduction
  • Gunnison Basin Water Resources Allocation Model
  • Case Studies
    • Water Availability Analysis (Historical Hydrology)
    • Water Availability Analysis (CRWAS Projected Climate Hydrology)
    • Upper Basin Supplemental Irrigation Decrees
    • Multipurpose Win-Win Projects
    • Instream Flow Analysis
  • Mapping Overlays
section 4 basin projects
Section 4: Basin Projects
  • Introduction
  • Project Lists
    • Planned Projects
    • Environmental Protections and Monitoring
    • Completed and Ongoing Projects
  • Project Summary Template
  • Project Summaries (Planned Projects)
section 4 projects to highlight
Section 4: Projects to Highlight
  • Tier 1: Implementation likely feasible by 2020; project does excellent job of meeting Basin Goals.
  • Tier 2: Implementation likely not feasible by 2020; project would excel at meeting Basin Goals. Project may also have important conditional water rights and/or completed planning efforts.
  • Tier 3: Implementation likely not feasible by 2020; project in preliminary stages of planning and/or may meet Basin Goals to lesser degree.
section 4 planned project list
Section 4 – Planned Project List
  • Started withmost recent SWSI list – new & refined
  • Projects assessed for: water availability, feasibility, and competition for same water
  • Modeling analysis as requested
  • Large variability in project data
  • Significant effort in data collection
  • Proposed inventory projects
    • Inventory, assessment, and prioritization
    • Address infrastructure needs
section 5 conclusions recommendations
Section 5: Conclusions & Recommendations
  • Introduction
  • Conclusions
    • Basin Goals
    • Basin Needs
    • Basin Evaluations
    • Basin Projects
    • Project Effectiveness in Meeting Goals and Measurable Outcomes
  • Recommendations (Implementation Strategies)
    • Project Acceptance
    • Project Feasibility
gbip status
GBIP Status
  • On schedule and on budget
  • GBRT review of 2 full drafts (tracking changes)
  • Incorporating final comments
  • Final draft comment deadline this Friday (7/18/14)
  • GBIP Subcommittee Meeting: 7/29/14
  • Submittal to CWCB: 7/31/14
  • No current plans for further funding