180 likes | 320 Views
The NCSX Engineering Web – An Overview. Part IV Engineering Management & Systems Engineering and Other. Purpose. Provides overview indoctrination of several parts of the NCSX Engineering Web This module will focus on the last two parts of the NCSX Engineering Web
E N D
The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other Module 2D
Purpose • Provides overview indoctrination of several parts of the NCSX Engineering Web • This module will focus on the last two parts of the NCSX Engineering Web • Engineering Management & Systems Engineering • Other • Parts I–II and IV will provide overview indoctrination of the other parts of the NCSX Engineering Web • Part I (Module 2A) – Work Planning & Project Control, Project Files, and Management Plans & Procedures • Part II (Module 2B) – Specs, Design Criteria, & Statements of Work and Design Reviews, Analyses, and R&D • Part III (Module 2C) – Design Data and Fabrication Assembly, and Installation & Test Plans • Later modules to go into much further depth on how the NCSX Project will do business • The NCSX Engineering Web is, to a major extent, the electronic NCSX filing system • Exceptions are the models and drawings contained in the Pro/INTERALINK data base and the hard copy supplier and other PPPL documents stored in the PPPL Operations Center • However – bulk of files stored electronically on this web Module 2D
Engineering Management & Systems Engineering • Engineering Mgmt & Systems Engineering • Information Links • Critical Issues • Org Chart • WBS Dictionary • ECPs & ECNs • Stellarator Info • Electronic Signatures Module 2D
Critical Issues As part of the WP process, risks are identified per ENG-032 processes when the WP is initiated Purpose of Critical Issues List is to identify near term risk items that have been identified and to track their status • 3 Stages of Risk Mitigation • 1 – risk identified but no mitigation plan formulated • 2 – risk mitigation plan now formulated and being implemented • 3 - risk retired Module 2D
NCSX Organization Chart Overall Project and Engineering Organization Charts Color Coding Reflect Home Organization Module 2D
WBS Dictionary Describes Scope of Project Module 2D
ECPS and ECNs Links to Forms Details of Each ECP Link to Each ECP Module 2D
Interface Control Scope Sheet are Interface Planning Documents ICDs Represent Formal Agreements Between WBS Managers on Interfaces Module 2D
Electronic Signatures • Tabulation of Approved Electronic Signatures • User can ensure that signature is valid • NCSX Utilizes Electronic Signatures for Majority of Project Documents/Drawings • Requires Adobe Acrobat 5.0 or later Module 2D
Other • Other • Information Links • ES&H • ACC Documents • QA • Conventions • Stellarator Info • Useful Links • Training Module 2D
ES&H • NCSX ES&H Guidelines and Practices • Goal • Procedures and Best Practices • Project Specific ES&H Documents • Preliminary Hazards Analysis • Environmental Assessement • FONSI • etc. • Interesting Links • Cryogenic Training Course Module 2D
Activities Certification Committee (ACC) Documents • ACC tasked with reviewing proposed new/modified facilities at PPPL • This page captures pertinent information on ACC reviews of NCSX • Charge • Presentation material to ACC • ACC Report • Project Responses to ACC Report • Tracking Log of ACC action items Module 2D
Quality Assurance (QA) • NCSX Project Specific QA Items • Non-conformance Reports (info copies – originals in PPPL Ops Center) • Audit Reports of NCSX Project • Audit Reports • Tracking Log of QA Audit Finding Action Items Module 2D
NCSX Conventions • Provides Conventions for the NCSX Project • Coordinate System • Defining Surfaces in Fourier Harmonics • Defining Coil Geometry in Filament Formats • Port Identification Scheme • Naming Convention for Coil Filament Files • Naming Conventions for Coils, Periods, etc. Module 2D
Stellarator Information Useful Links to the World’s Other Stellarators Module 2D
Useful Links Useful Sites on Fusion Module 2D
Training • Includes: • Link to NCSX Training Plan • Links to NCSX Task-Specific Manufacturing Training Matrices • Links to NCSX Training Modules • Link to PPPL Human Resources Department Training Page Module 2D
Summary • This introduction to the NCSX Engineering Web module has covered several parts of the NCSX Engineering Web • Engineering Management & Systems Engineering • Other • Other introductory modules will cover the remaining parts of the NCSX Engineering Web • Module 2A – Work Planning & Project Control, Project Files, and Management Plans & Procedures • Module 2B - Specs, Design Criteria, Statements of Work and • Module 2C - Design Data and Fabrication, Assembly, and Design Reviews, Analyses, and R&D Installation & Test Plans • More detailed modules will focus in depth on key aspects of how the NCSX Project will do business Module 2D