1 / 2

Renovation Project for Music Studios Room #019 in Wesleyan University

Follow the reference project manual dated 1/20/14 for major maintenance FY 15 - See existing condition photos dated 10/20/14.

Download Presentation

Renovation Project for Music Studios Room #019 in Wesleyan University

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 CFA F MUSIC STUDIOS ROOM #019 – BASEMENT LEVEL 297 WASHINGTON TERRACE SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 10/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-019-1

  2. NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 CFA F MUSIC STUDIOS ROOM #019– BASEMENT LEVEL 297 WASHINGTON TERRACE SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 10/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-019-2

More Related