20 likes | 100 Views
Detailed renovation project for the music studios room #022 at Wesleyan University's basement level. Photos and specifications included. Major maintenance planned for fiscal year 2015. Contact Construction Services for more information.
E N D
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 CFA F MUSIC STUDIOS ROOM #022 – BASEMENT LEVEL 297 WASHINGTON TERRACE SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 10/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-022-1
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 CFA F MUSIC STUDIOS ROOM #022 – BASEMENT LEVEL 297 WASHINGTON TERRACE SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 10/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-022-2