1 / 2

Music Studios Room #022 Maintenance Project at Wesleyan University

Detailed renovation project for the music studios room #022 at Wesleyan University's basement level. Photos and specifications included. Major maintenance planned for fiscal year 2015. Contact Construction Services for more information.

Download Presentation

Music Studios Room #022 Maintenance Project at Wesleyan University

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 CFA F MUSIC STUDIOS ROOM #022 – BASEMENT LEVEL 297 WASHINGTON TERRACE SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 10/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-022-1

  2. NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 15 CFA F MUSIC STUDIOS ROOM #022 – BASEMENT LEVEL 297 WASHINGTON TERRACE SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 10/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-022-2

More Related