This document presents existing condition photos related to the Judd Hall Stairwell Lighting Replacement Project at Wesleyan University, dated January 20, 2014. It outlines the scope of work for the project, which includes the removal of old light fixtures and installation of new fixtures in designated locations. The contractor will ensure proper mounting and installation of junction boxes, with all relocated fixtures adequately covered and finished. This project contributes to the ongoing maintenance and improvement of university facilities for enhanced safety and functionality.

ezra-perry
Download Presentation

Judd Hall Stairwell Lighting Replacement Project: Existing Condition Photos

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 207 JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. MAJOR MAINTENANCE FY 15 REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-29-1

  2. 207 JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. MAJOR MAINTENANCE FY 15 REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-29-2

  3. Scope of Work (Reference MMFY15 Project Manual for all general project requirements) • Contractor shall remove and discard existing light fixtures. • Contractor shall provide and install new light fixtures in new locations identified. Mounting requirements shall include but not be limited to unistruct attachment to underside of stair landings. • Provide junction box covers for all fixtures relocated from existing wall mounted locations. • New fixtures to be: • Patch, prime and paint covers, conduit, wiremold, mounting systems. Draft Only – Fixture Spec and Scope to be provided… 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 01/20/14 PHOTO. NO. REVISIONS WESLEYAN U N I V E R S I T Y Construction Services 170 Long Lane Middletown, CT 06457 P-29-3