An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CENTRE RISK ASSESSMENT 20008-09 NQF BTEC Levels 2 & 3 (including Short Courses at Levels 1-3)

  2. CRA 2008-09 • Ensures approval obligations continue to be met • Drives up quality of provision of BTEC programmes • CRA measures a centre’s identification and control of known risks • CRA confirms centre quality management against defined risk assessment criteria • CRA: • Will involve ALL live BTEC centres • 700 visit assessments • All other centres will undertake self assessment

  3. The CRA Report • 15 identified risk areas • Grouped into three Assessment Sections: • Managing Assessment Risks • Managing Learning Risks • Managing Resource Risks • Each section is characterised by a specific risk type • Identified risks are managed by appropriate Risk Controls • These provide the basis for judging centre quality systems • Plan Centre Development (PCD): monitored actions and recommendations

  4. Risk Controls • Risk Controls = standardisation tool to aid consistent judgements • Risk Controls are general, standardised statements which set out ways to manage identified risk • Risk Controls are applied to centre systems in order to make judgements • Risk Controls are prescriptive • Risk Controls requirements apply to each Risk Area

  5. Risk Controls • Enables effective assessment against each Risk Area • Centre only meets Risk Controls for each Risk Area if Risk Control is adequate: (1) Exists (2) Enforced (3) Effective • Adequacy of controls judged on a three point scale • Only if all controls in place will no action be required • Actions are mandatory and assure BTEC centre systems • Recommendations are advisory and help provide centre support

  6. Visit Assessment • Centres selected for a visit will be informed Summer 2008 • Risk Assessor will make contact by end September 2008 to confirm: • Visit date • What is assessed • Documentation required • CRA visit window = 01/11/2008 – 28/02/2009

  7. Visit Assessment • Risk Assessors view centre systems and programme team practice • Risk Assessors draw a big picture: Don’t get bogged down in detail • Risk Assessors make judgements on evidence and what seen on visit, but… • Advocate good practice – encourage centre development

  8. Visit Assessment • Focus – one day assessment visit: some variation • Assessment of centre systems and two Programme Area Titles (PATs) • PATs to be assessed identified by Edexcel • CRA report will be available on Edexcel Online – automated email alerts Quality Nominee when report is submitted • Centre undertakes actions and recommendations in PCD • Managing Assessment Risk actions monitored within three months • All other actions monitored at next CRA

  9. Introduction of Self Assessment 2008-09 • Self Assessment introduced to lessen bureaucracy • Variable pattern of visit and SA for centres over time • Operates on same Risks and Controls as visit assessments • Programme areas selected by centre • Quality Nominee carries out risk assessment and completes report online • Action plans are monitored as required • Edexcel Quality Manager may provide support as required • CRA self assessment window = 01/11/2008 – 28/02/2009