An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lackawanna/Luzerne MPOCurrent Transportation System

  2. Miles of State Highways • Total: 1,410 • Luzerne County – 853 • Lackawanna County - 557

  3. Road Conditions • International Roughness Index (IRI) • Roadway Median IRI 5-Yr. Trend • Interstate 84 (Good) 94-84 (Good) • NHS Non Interstate 108 (Good) 116-108 (Good) • Non NHS, ADT over 2,000 93 (Excellent) 100-93 (Excellent) • Non NHS, ADT under 2,000 122 (Good) 135-122 (Good) • Source: 2008 PennDOT State of Pavement Report (Data reflects District 4-0 Conditions)

  4. Resurfacing Cycles • High Level Roads: 8 – 12 Years • Low Level Roads: 20 Years • Addition of Seal Coat Treatment: 5-7 Years

  5. Current Resurfacing Project

  6. Pavement Maintenance Backlog • Luzerne County - $55.4 Million • Lackawanna County - $51.3 Million • Total - $106.7 Million

  7. Bridges • State Bridges – 979 • Luzerne County – 564 • Lackawanna County – 415 • (Refers only to bridges 8 feet or greater in length) • Local Bridges – 163 • Luzerne County – 99 • Lackawanna County – 64 • (Refers only to local bridges which are 20 feet or greater in length) • Total – 1,142

  8. Structurally-Deficient (SD) Bridges • State SD Bridges – 185 • Luzerne County – 114 • Lackawanna County – 71 • Local SD Bridges – 72 • Luzerne County – 43 • Lackawanna County – 29 • Total State & Local: 257

  9. Weight Restricted Bridges • State Bridges – 28 • Luzerne County – 14 (Posted) • Lackawanna County 14 (Posted) • Local Bridges – 55 • Luzerne County – 36 Posted, 4 Closed • Lackawanna County - 19 Posted, 4 Closed

  10. Bridge Preservation • Right Treatment at Right Time • Extend Life of Structures

  11. I-81 Cemetery Bridges

  12. MPO Philosophy • Preserve Existing System • Address SD Bridges • Maintain Roadways • Safety – Reduce Fatalities

  13. Transportation Improvement Program • Philosophy in Action • Excluding Line Items, 144 projects on TIP • 88 (61%) projects are either: • Bridge Replacement • Bridge Rehabilitation • Bridge Preservation • Meets 80% - 20% Goal

  14. New Lackawanna Avenue Bridge, Scranton Transportation Improvement Program • Philosophy In Action • Excluding Line Items, 144 Projects • 88 Projects (61%) – • Bridge Replacement • Bridge Rehabilitation Bridge Preservation

  15. Progress Made: From 2004 – 2009 91 SD Bridges Repaired or Replaced Luzerne County – 55 Lackawanna County - 36 Progress Made • From 2004 – 2009 • 91 State SD Bridges Repaired or Replaced • Luzerne County - 55 • Lackawanna County – 36

  16. Progress Made • Between 2004 and 2009 • 91 SD Bridges Replaced or Rehabilitated • Luzerne County – 55 • Lackawanna County 36

  17. Challenges Remaining • From 2004 – 2009 • New SD Bridges – 90 • Luzerne County – 57 • Lackawanna County - 33

  18. Safety Trends

  19. Safety Strategies • Intersection Improvements • Remove Weave • Curve Warning • Median Delineation • Sign Replacement • Update Guiderail • Rock Fence Installation

  20. Funding: Resources vs. Need TIP Allocation 2009: $65M • 2010: $67M • 2011: $69M • 2012: $71M • Annual Resources Needed: $122.2M

  21. Other Funding Sources • ARRA • Bond • Act 44 • Maintenance • Help Reduce Annual Deficit

  22. Funding Deficit

  23. 2011 TIP 2011 TIP Allocations • 2011: $55.3M • 2012: $55.3M • 2013: $56.4M • 2014: $57.6M • No ARRA Funds • Projected Reductions in Bond & Act 44 Funds • Deficit Between Needs and Resources Increases

  24. Project Prioritization • Long Range Transportation Plan (LRTP) Update Underway • New Project Prioritization Process

  25. Linking Transportation, Land Use and Economic Development • Bi-County Comprehensive Plan Underway • Bi-County Hazard Mitigation Plan Underway • Update of LRTP Underway • Provides Unique Opportunity to Tie 3 Elements Together

  26. Summing Up • Lack of Sufficient Funding to Preserve System Let Alone Finance New Construction • Integration of Land Use & Transportation Planning

  27. Questions? Nancy Snee, Luzerne County Planning Commission 570-825-1564 Nancy.Snee@luzernecounty.org