1 / 10

Bidding Components – Information Required to Complete an Invitation for Bid

Bidding Components – Information Required to Complete an Invitation for Bid. Requisition to encumber the necessary funds. Detailed technical specifications. Clear method of award criteria. Contract Reporter guidelines compliance (State only). Bidders list. Thorough review of all proposals.

motts
Download Presentation

Bidding Components – Information Required to Complete an Invitation for Bid

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bidding Components – Information Required to Complete an Invitation for Bid • Requisition to encumber the necessary funds. • Detailed technical specifications. • Clear method of award criteria. • Contract Reporter guidelines compliance (State only). • Bidders list. • Thorough review of all proposals. • Recommendation for award. • Execution of final contract. • Final approval from appropriate authority.

  2. Drafting Bid Specifications • Technical specifications should be developed independently based on the end user needs. A consultant may be utilized to assist in the drafting and response review. • Vendors who assist in bid drafting are not allowed to bid on the procurement. • Referencing a make and model is permitted but allowance for equivalent offerings is required.

  3. Drafting Bid Specifications (Cont’d) • Specifications need to include mandatory requirements but cannot unreasonably restrict the number of bidders. • Inclusion of expected warranty requirements, detailed delivery requirements and/or custom brokerage charges are important components to include in the bid documents. • Prequalifications limiting the pool of bidders to those meeting specific requirements may be used with appropriate justification. • Prequalification criteria may include the requirement that bidders are authorized Agents of the manufacturer or are certified by the manufacturer to perform a certain service.

  4. Drafting Bid Specifications (Cont’d) • The requirement of mandatory items in a bid should be limited to necessary items. If mandatory specifications are not met by a bidder, the entire bid must be rejected. • Specifications involving installation require a certificate of insurance and a wage rate schedule from the Department of Labor with the bid. • All bidders must disclose the use of subcontractors. • The primary contractor must ensure that subcontractors comply with all requirements of the award.

  5. Drafting Bid Specifications (Cont’d) • Terms directly related to what is being purchased are to be included in the bid. • Important terms include: • Right to reject any and all bids; • Right to accept best and final offers; • Right to issue amendments to correct errors; • Extension of bid opening date; and • Request clarification. • MWBE goals will be noted in the bid and advertised in the NYS Contract Reporter. • Allowance for written Q&A’s help to ensure that bidders understand the nature and scope of the bid and may identify possible problems with bid. • Inclusion of the date written questions are due and the date answers will be sent out are part of the bid document.

  6. Drafting Bid Specifications (Cont’d) • Walkthroughs for technical bids or those requiring installation allows potential bidders to review the project. • Walkthroughs must be noted in the document with the date, time, location and contact person stated. • Mandatory walkthroughs require a sign in sheet which is to be submitted to the Purchasing Office upon the conclusion of the walkthroughs. • Bid rejection for missing a mandatory walkthrough must be stated in the bid document. • Answers to questions raised at walkthroughs must be shared with all potential bidders.

  7. Drafting Bid Specifications (Cont’d) • Special bidding regulations include but are not limited to: • Printing; NYS Printing Law. • Contract limited to 2 years • Press work cannot be subcontracted • Must be an IFB • Textiles; Fair Labor Standards • Requires vendor to provide notarized attestation that product was not produced in ‘sweatshop’ conditions • University must receive acceptable attestation before an award can be made • Textiles using the University Logo or Word Mark must be Licensed by the University’s Licensing Contractor • Recycling content specifications; EO4 • Governor's Executive Order #4 requires maximizing the use of environmentally preferable or “green” commodities, services and technology • All copy paper, janitorial paper, printing and other paper supplies purchased shall be composed of 100% post-consumer recycled content to the maximum extent practicable, and all copy and janitorial paper shall be process chlorine-free to the extent practicable. • Bidders will be required to submit documentation stating that they can meet the requirements.

  8. Submittal Review • Bids received by the opening time are publicly read by the Purchasing Office. • After recording, the bids are forwarded to the technical team for review. • The technical team makes a written determination of award and forwards it to the Purchasing Associate (“PA”). • Award must be made to the lowest responsible bidder meeting the mandatory requirements • The PA will review the math and technical scoring. • Bid rejection for non-conformance must be for significant issues and must be outlined in the bid.

  9. Submittal Review (Cont’d) • Bids rejected due to specifications not being met need to be noted along with supporting documentation as to why that specification was necessary. • Losing vendors are required to be given a debriefing as to why they were unsuccessful and may file a formal protest • The winning bid must be reviewed to ensure all specifications are met. • All bidders will be notified by the Purchasing Office of the results. • Copies of the bid tabulation can be provided upon request and are available in the New York State Contract Reporter.

  10. Time Line • Based on Final Draft Bid being completed • Contract Reporter Advertisement 3 Week Min. • Evaluating Bids Approximately 1-2 Weeks • Contract Development and Signature 3 Weeks (if required) • NYS Attorney General Approval 2 Weeks (only for Contracts) • NYS Comptroller Approval 4-6 Week Min.