1 / 1

New Aircraft Production New Aircraft TC Existing Aircraft

Halon Replacement Dates. New Aircraft Production New Aircraft TC Existing Aircraft. ICAO EASA ICAO EASA ICAO EASA. Lavatory. 2012 2021 2012 2012 None 2021. Handheld (Portable). 2017 2025 2015 2015 None 2025. Engine/APU.

morna
Download Presentation

New Aircraft Production New Aircraft TC Existing Aircraft

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Halon Replacement Dates New Aircraft ProductionNew Aircraft TCExisting Aircraft ICAO EASAICAO EASA ICAO EASA Lavatory 2012 2021 2012 2012 None 2021 Handheld (Portable) 2017 2025 2015 2015 None 2025 Engine/APU None 2041 2015 2015 None 2041 Cargo None 2041 None 2019 None 2041 The following should be noted: EASA has retrofit dates as the EU has use restrictions on Halon. However they have no dates for new production (therefore new production is the same as retrofit). New type design dates are the same, except the add one for cargo in 2019. (This date is the date of application for type design. aircraft produced is probably 4 to 5 years later).

More Related