An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Soilwork and machines VIA / TCU 4th semester workshop S2017 • Factors to remember in the working process • Heavy lifts • Weather at site • Crew facilities • Weight of the machines • Safety on site • Transportation of machine • Space required to work • Workzone / area (sand/clay) • Crew skills (experience) • Fuel for the machines VIA University College TCU-VIA Workshop – S2017 1

  2. Wagons for the crew VIA / TCU 4th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 2

  3. Soilcompactingmachines Plate Compactor VIA / TCU 4th semester workshop S2017 • Weight • Range • Work zone/area • Space required VIA University College TCU-VIA Workshop – S2017 3

  4. Diggingmachines VIA / TCU 4th semester workshop S2017 • Weight • Range • Work zone/area • Space required VIA University College TCU-VIA Workshop – S2017 4

  5. Soildigging and moving VIA / TCU 4th semester workshop S2017 • Weight • Range • Work zone/area • Space required VIA University College TCU-VIA Workshop – S2017 5

  6. Soiltransportation VIA / TCU 4th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 6

  7. Measuringtools VIA / TCU 4th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 7

  8. Special soilmachines VIA / TCU 4th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 8

  9. Exercises – soilwork VIA / TCU 4th semester workshop S2017 VIA University College TCU-VIA Workshop – S2017 9

  10. Exercises – soilwork VIA / TCU 4th semester workshop S2017 • We uses Nicolais excel sheets, and the code to open the sheet is “ngh” • The sheet are to be found as below Calculations excel sheets for soil work VIA University College TCU-VIA Workshop – S2017 10

  11. Exercises – Movingsoil withthe dozer VIA / TCU 4th semester workshop S2017 • Calculate the following for each area: • If the topsoil is 30 cm deep. How many m3 is there to move for the dozer? • How many m3 of topsoil can a good (straight) driver do per hour • How many m3of topsoil can a bad driver do per hour VIA University College TCU-VIA Workshop – S2017 11

  12. Exercises – Movingsoil withthe wheel loader VIA / TCU 4th semester workshop S2017 • Calculate the following for each area: • How many m3of sand soil is too be moved in the two cases (without the topsoil quantity? • How many m3 of sand soil can a good (straight) driver do per hour • How many m3 of sand soil can a bad driver do per hour VIA University College TCU-VIA Workshop – S2017 12

  13. Exercises – Diggingsoil byhand VIA / TCU 4th semester workshop S2017 • Calculate the following for each area: • How many mh does it take to dig the hole if the soil is light and it has to be moved 50 m? • How many mh does it take to dig the hole if the soil is very heavy and it has to be moved 50 m? • What does light soil and heavy soil means and what is the difference? • When do we use the shovel instead of a machine? VIA University College TCU-VIA Workshop – S2017 13

  14. Exercises – Diggingsoilexcavator VIA / TCU 4th semester workshop S2017 • Calculate the following for the truncatedpyramid for the theoretical production and the data next to here: • How many m3/h can the machine produce when digging in sand • How many m3/h can the machine produce when digging in wet sticky clay • Why is there a difference? • Calculate how long it will take for the machine, if the soil is hard plastic clay and when using the biggest shovel (2,4 m3) VIA University College TCU-VIA Workshop – S2017 14

  15. Exercises – Diggingsoilexcavator VIA / TCU 4th semester workshop S2017 • Prices for excavation. • In the catalog from: LOXAM+Rental+prisliste+2015_16 • We choose an excavator: 057-0033 CASE CX160 at site 7 in the catalog. • Calculate how long it will take for the machine, if the soil is hard plastic clay and when using the biggest shovel (2,4 m3) • For this question – how much will it cost in digging expenses? 1 CNY = 1 DKK VIA University College TCU-VIA Workshop – S2017 15