UNIVERSITAS GUNADARMA FAKULTAS TEKNIK SIPIL DAN PERENCANAAN PERENCANAAN FONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTA Nugraha Sadeli Utama NPM 10307065. LATAR BELAKANG.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'LATAR BELAKANG' - meryl


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Latar belakang

UNIVERSITAS GUNADARMAFAKULTAS TEKNIK SIPIL DAN PERENCANAANPERENCANAANFONDASI TIANG BOR PADA PROYEK GEDUNG IKPT JAKARTANugrahaSadeliUtamaNPM 10307065


Latar belakang
LATAR BELAKANG

Dalampembangunansuatuproyekkonstruksidibutuhkanperencanaanstruktur yang kuat, aman, dannyaman. Salah satubagianbangunanuntukmendukunghaltersebutadalahfondasi.

Fondasimerupakanbagian yang pentingdalambangunan, karenaitupertimbanganteknisdalammemilihtipe, menentukankedalamandandimensi, kapasitasdukungdanmerancangstrukturnyamerupakanhal yang harusdipelajaridenganbaik.


Tujuan
TUJUAN

TujuandaripenulisantugasakhiriniadalahuntukmerencanakandesainfondasitiangborpadaproyekGedung IKPT Jakarta yang meliputi:

  • Dimensifondasitiang bor.

  • Dayadukungfondasitiang bor.

  • Penurunanfondasitiang bor.

  • Dayadukung lateral fondasitiangbordandefleksiakibatbeban lateral.

  • DimensiPile Cap.


Batasan penulisan
BATASAN PENULISAN

Padapenulisantugasakhirini, penulismembatasipembahasanpada:

  • Perencanaandesainfondasitiangbormenggunakancara manual.

  • Perencanaandesainfondasitiangbormenggunakanbantuan program Plaxis.



Fondasi
FONDASI

Fondasiadalahbagiandarisuatustrukturbangunan yang berfungsiuntukmeneruskanbebandaristrukturatasketanah, baikakibatbebanvertikalmaupunbeban horizontal.


Latar belakang

JenisFondasiSecaraUmum


Fondasi tiang bor
FondasiTiangBor

Hampir di setiapproyekkonstruksifondasitiangmerupakanteknologifondasidalam yang telahjamakdipergunakan. Salah satumetodepemasangantiangfondasiiniadalahdengansistem bor.

Kedalamandan diameter daritiangbordapatdivariasidenganmudah, fondasitiangbordipakaiuntukbebanringanmaupunbebanberatsepertibangunanbertingkattinggidanjembatan.


Latar belakang

ContohPelaksaaanKonstruksiTiangBor


Metode perencanaan
METODE PERENCANAAN

Diagram AlirTugasAkhir


Latar belakang

Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual


Latar belakang

Diagram AlirAnalisisDesainFondasiTiangBordengan Cara Manual


Latar belakang

Diagram AlirAnalisisDesainFondasiTiangBordengan Program PLAXIS


Hasil pembahasan
HASIL PEMBAHASAN

  • Digunakandimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m.

  • Berdasarkanhasilperhitungandiperolehdayadukungsebesar:


Latar belakang

  • Penurunan yang terjadiberdasarkancara manual:

    Penurunanyang terjadiberdasarkan program PLAXIS:


Latar belakang

Sedangkanuntukpenurunankelompoktiangdiperolehpenurunansebesar 0,0020 m sampai 0,0101 m.

  • Dayadukung lateral tiangadalahsebesar:

    Defleksiyang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.


Latar belakang

  • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.


Kesimpulan
KESIMPULAN

  • Berdasarkanhasilperhitungan, diperolehdesaindimensifondasitiangbordengan diameter 0,5 m danpanjangtiangbervariasipadasetiaptitikfondasiantara 21 m sampai 39 m.

  • Berdasarkanhasilperhitungandiperolehdayadukungfondasitiangborsebesar 65,02 ton sampai 127,82 ton.

  • Berdasarkanhasilperhitungandiperolehpenurunanfondasitiangbortunggalsebesar 0,0234 m sampai 0,0468 m. Sedangkanuntukpenurunankelompoktiangdiperolehpenurunanterbesarsebesar 0,0020 m sampai 0,0101 m.


Latar belakang

  • Berdasarkanhasilperhitungandiperolehdayadukung lateral tiangborsebesar 11,22 ton sampai 17,61 ton. Defleksi yang terjadiakibatbeban lateral adalahsebesar 1 inch atau 0,0254 m.

  • Berdasarkanhasilperhitungandiperolehdimensipile cap yang bervariasipadasetiaptitikfondasiyaitudenganpanjangdanlebarantara 0,8 m sampai 4,8 m dantebalpile capsebesar 1 m.


Saran
SARAN

Dalammelakukanperencanaanfondasihalpenting yang harusdiperhatikanadalahkarakteristiktanahdimanabangunantersebutakandidirikan. Olehkarenaitumutlakdiadakanpenyelidikantanah (soil investigation) terlebihdahulu. Selainitu, untukperancanganselanjutnyasebaiknyaseismic designikutdiperhitungkan.


Gambar detail
Gambar Detail

  • FondasiTiangBor

  • Detail Pile Cap Type-1

  • Detail Pile Cap Type-2

  • Detail Pile Cap Type-3

  • Detail Pile Cap Type-4

  • Detail Pile Cap Type-5

  • Detail Pile Cap Type-6

  • Detail Pile Cap Type-7

  • Detail Pile Cap Type-8

  • Detail Pile Cap Type-9