Product Roadmap Update MicroStation V8 i. John Frampton Product Manager - MicroStation and PowerDraft Bentley Systems. MicroStation V8 i Feature Map. Project Coordination. Design Productivity. Change Management. Design Modeling. References. Digital Security. Interoperability.
E N D
Product Roadmap UpdateMicroStation V8i John Frampton Product Manager - MicroStation and PowerDraft Bentley Systems
MicroStation V8i Feature Map Project Coordination Design Productivity Change Management Design Modeling References Digital Security Interoperability Standards Management Printing & Plotting Large Image File Support Workgroup Collaboration Geo-Coordination Application Extensibility Dynamic Views Visualization Graphics Performance Design Review Animation
MicroStation V8i Feature Map Bentley Applications Project Coordination Design Productivity Change Management Paper Plot Sets Design Modeling AutoCAD References Digital Security 2D/3D PDF Plot Sets Autodesk Applications Interoperability Standards Management Printing & Plotting Bi-directional Interoperability Intelligent Deliverables i-models ESRI Applications Large Image File Support Workgroup Collaboration Geo-Coordination Images Rhino & SketchUp Application Extensibility Dynamic Views Visualization Other Applications Graphics Performance Design Review Animation Videos
MicroStation V8i Features Interoperable Software Intuitive Design Modeling • Trusted RealDWG support • Reference 50+ image types • Object Enabler support • Rhino 3DM, SketchUp SKP • 3DS, Google Earth KML • ProjectWise integration • Push-Pull solids editing • Freeform surface creation • Generative Design • 3D Printing Support • Flexible mesh modeling • Place Google Content Intrinsic Geo-Coordination Iterative Luxology Rendering • Geospatial Referencing • Simple AEC Transformation • OGC Web Map Server support • GPS Device Integration • Create Geo-Coordinated PDF • Reference ESRI SHP Files • Google Earth Integration • Near real-time realistic rendering • Point-and-shoot simplicity • Rich Photorealistic Content (RPC) • Distributed/networked rendering • Professional quality animation • Multi-core support for 32 processors Interactive Dynamic Views Insightful Design Review • Create or manage markups • Overlay markup files • Publish i-models for review • Approve/reject comments • View status/notifications • Simplify 3D experience • Slice and filter 3D models • Streamline DrawingComposition • Drag and drop views • Automate drawing updates • Update linked annotation
Current Version Highlights:MicroStation V8i(SELECTseries 1) Version #: • 08.11.07.1xx Originally released date: • 10/2009 Operating Systems supported: • Windows XP, Windows Vista, Windows 7 • 32 bit and 64 bit • Windows Server 2003, Windows Server 2008 ProjectWise Compatible: • ProjectWise V8i • ProjectWise V8i (SELECTseries 1)
Current Version Highlights:MicroStation V8i(SELECTseries 1) Architecture: • Supports V7 DGN and V8 DGN • No change to installation folder structure • Can this version co-exist with the previous version: No for V8i, Yes, for XM and earlier– When installed into unique directories Interoperability: • SHP, MAP, MID, MIF • Reference • Geospatial PDF • Raster Reference • Creation • RealDWG libraries AutoCAD 2009 • 2010 in Q409 (Flexible Extension) • 2010 Object Enablers support • Google SketchUp V7 • Import • Export • Reference
Current Version Highlights: MicroStation V8i(SELECTseries 1) Dynamic Views: • User-defined Detailing Symbols • Active Detailing Symbol Style for Annotation Tools • Drawing Model Type • Create Dynamic View option • Create Saved View • Create Drawing Model • Create Sheet Model • Saved View Navigation to Drawing Model Printing: • Create Geo-Referenced PDF • Include Design Links from Project Explorer in PDF • PDF Measuring Productivity tools: • Trim Tool Consolidation • Trim to Element Multi-select Operation • Trim tools work with all element types Project Explorer: • Harvesting from Multiple Configuration Variables • Harvesting from Variable Plus a Folder • Harvesting of Drawing Models Raster Manager Enhancements: • Place Interactive by Three Points Reference File Enhancements: • Change Attachment Orientation • Reference Detail Scale • Attach GEOPDF Saved Views Enhancements: • Update Saved View in the Saved Views Dialog settings appear in Tool Settings • Saved View Toolbox • Saved View Apply Options Moved to Tool User Enhancements: • Improved Dialog Docking • Docking Indicators • Auto Hide and Roll-out Tabs • More Dialogs Are Now Dock-able • Enhanced Display Styles Dialog Settings • Measure Tool Improvements for Start, End, and Delta • Clip Volume Toolbox • Clip Volume Tool Consolidation Design Review: • Markup manager (overlay files) • Imodel publishing
Product Roadmap Update:MicroStation V8i(SELECTseries 2) Anticipated release date • Q3/2010 Operating Systems supported • Windows XP?, Windows Vista, Windows 7 • 32 bit and 64 bit • Windows Server 2003, Windows Server 2008 ProjectWise Compatible • ProjectWise V8i • ProjectWise V8i (SELECTseries 1) • ProjectWise V8i (SELECTseries 2)
Product Roadmap Update:MicroStation V8i(SELECTseries 2) Architecture • Supports V7 DGN and V8 DGN • No change to installation folder structure • Can this version co-exist with the previous version: No for V8i, Yes for XM and earlier– When installed into unique directories Interoperability • Point Clouds/LIDAR data • AutoCAD 2010/11 • Clash detection (additional license needed) • DGN ifilter/Plug-in
Product Roadmap Update:MicroStation V8i(SELECTseries 2) feature list Interoperability • RealDWG 2010 Support (FE) • RealDWG 2011 Support (FE) • Point Cloud Support (FE) • SHP Symbology Design Review • Clash Detection Support User Enhancements • Simplified Installer • My SELECT (FE) • Desktop DGN ifilter/Plug-in (FE) • EC based Reporting Luxology • Updates (FE) Dynamic Views • Dynamic Views Model Documentation • Minor DV Enhancements
MicroStation V8i(SELECTseries 2)Dynamic Views Model Documentation • Drawings are understood in context, for faster, deeper, insight
Product Roadmap UpdateMicroStation V8i John Frampton Product Manager - MicroStation and PowerDraft Bentley Systems