An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. David Sorenson Daniel Michaluk Brent Fraser Faculty Advisor: Yang Shi Automated Sandblasting System

  2. In Operation Since 1981 • Located In Saskatoon • Massload Technologies produces • Standard and Custom load cells and pins • Vehicle and Industrial weighing sytems • Currently produce approximately 30 units daily • Produce many different geometries Company Information

  3. Reduce the amount of man-hours required for sand blasting Increase number of units produced per day Make the system Adjustable for varying geometries Reduce health risks to operator Problem description

  4. Current Facilities

  5. Select Workable Alternatives by October 31st Feasibility Study and Prototype ready for production by November 24th Begin Testing by December 15th Redesign Prototype by January 8th Complete Final Testing by January 21st Project Schedule

  6. Robotic/CNC Multi-Level Conveyor Belt Turntable Part Suspension Axial Rotating part Current design alternatives

  7. Questions?