1 / 7

E-receipt System

E-receipt System. Kamal McCray Kamran kowsari Yuan Gao Fenhan Wang. System Objective. Generally, A simple registration application system. We can develop a search system of the E-receipt system by Lucence. And we use JSP to develop a interface of website which faces to client.

masako
Download Presentation

E-receipt System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E-receipt System Kamal McCray Kamran kowsari Yuan Gao Fenhan Wang

  2. System Objective • Generally, A simple registration application system. • We can develop a search system of the E-receipt system by Lucence. And we use JSPto develop a interface of website which faces to client. • After building that, we can make our client receive online receipt by PDF creator.

  3. System Objective cont.

  4. System Requirment • Project architecture • Client-server based • Data • MYSQLdatabase • Frameworks • Apache Click • Compatibility • Internet Explorer • Firefox • Safari

  5. Software requirements • Windows or Lunix environment can be leverage for the development and production of our application. • Apache Tomcat Servlet container • Apache Click Framework • MYSQL Database • JfreeChart • Apache Maven

  6. Roles of Guys • Kamal ->Frame design and defect testing • Kamran -> Persistence And Model modules • Fenhan ->Controller and UI modules • Gao -> PDF and Email Services modules

  7. Where are we? • Phase 1: 2 sprints for features • Phase 2: 1 sprint for stabilization and defects • Phase3: 4 weeks of development and testing

More Related