600 likes | 601 Views
Operational verification in Poland (preliminary results). Joanna Linkowska Katarzyna Starosta. Institute of Meteorology and Water Management. COSMO General Meeting, Offenbach, 7-11 September 2009. Work Report in WG 5 in Poland. VERSUS: Installation and implementation
E N D
Operational verification in Poland(preliminary results) Joanna Linkowska Katarzyna Starosta Institute of Meteorology and Water Management COSMO General Meeting, Offenbach, 7-11 September 2009
Work Report in WG5 in Poland • VERSUS: Installation and implementation • Verification of surface parameters and precipitation using 56 SYNOP stations • Common plots • Data: June 2008- July 2009
METHODS • Run 00 UTC – model 14 km • ME, MAE, RMSE for continuous parameters: T2m, MSLP,Wspeed, W dir. • Period seasonally (JJA,SON,DJF, MAM) • Precipitation 12h and 24h (thresholds 0.2, 0.4, 0.6, 0.8, 1, 2, 3, 4, 5, 6, 7, 8, 9,10, 12, 14, 16, 18, 20) scores: FBI, POD,FAR,ETS