keep america moving during bridge construction aashto tig spmt bridge moves lead states team 2008 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Keep America Moving During Bridge Construction AASHTO TIG SPMT Bridge Moves Lead States Team 2008 PowerPoint Presentation
Download Presentation
Keep America Moving During Bridge Construction AASHTO TIG SPMT Bridge Moves Lead States Team 2008

Loading in 2 Seconds...

play fullscreen
1 / 16

Keep America Moving During Bridge Construction AASHTO TIG SPMT Bridge Moves Lead States Team 2008 - PowerPoint PPT Presentation


  • 135 Views
  • Uploaded on

Keep America Moving During Bridge Construction AASHTO TIG SPMT Bridge Moves Lead States Team 2008. “Get in, do it right, get out, and stay out.”. Keep America Moving During Bridge Construction Jugesh Kapur, P.E. Bridge Design Engineer Washington State DOT NHI Webinar June 26, 2008.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Keep America Moving During Bridge Construction AASHTO TIG SPMT Bridge Moves Lead States Team 2008' - maris


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

“Get in, do it right, get out, and stay out.”

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide3

SPMT technology =

ultimate flexibility and speed

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide4

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide5

What is an SPMT?

  • a combination of multi-axle platforms
  • computer-operated
  • pivots 360 degrees
  • lifts, carries, sets large/heavy loads
  • moves at walking speed

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide6

Why SPMT? Why Now?

  • Significantly Reduce Traffic Disruption

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide7

Why SPMT? Why Now?

  • Significantly Reduce Traffic Disruption
  • Open Highways To Traffic In Hours

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide8

Why SPMT? Why Now?

  • Significantly Reduce Traffic Disruption
  • Open Highways To Traffic In Hours
  • Improve Work Zone Safety

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide9

Why SPMT? Why Now?

  • Significantly Reduce Traffic Disruption
  • Open Highways To Traffic In Hours
  • Improve Work Zone Safety
  • Improve Quality and Constructability

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide10

Why SPMT? Why Now?

  • Significantly Reduce Traffic Disruption
  • Open Highways To Traffic In Hours
  • Improve Work Zone Safety
  • Improve Quality and Constructability
  • Increase Contractor and Owner Options

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide11

Examples of Project and User Cost Savings

  • less maintenance-of-traffic
  • possibility of less night work
  • reduced construction time
  • reduced onsite time for engineering and inspection requirements

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide12

Examplesof Project and User Cost Savings

  • reduction in construction-related user costs
  • lower contractor insurance premiums
  • reduced labor costs (water projects)

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

traffic impact comparison
Traffic Impact Comparison

Graves Avenue / I-4

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide14

How do I learn more?

  • TIG’s Lead States Team:
  • DOT and industry representatives
    • Technical assistance
    • Insight
    • Expertise
    • Advice

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide15

How do I learn more?

Florida

Tom Andres (Chair)(850) 414-4269

thomas.andres@dot.state.fl.us

Rhode Island

David Fish

(401) 222-2053, x 4022

dfish@dot.ri.gov

Washington

Jugesh Kapur

(360) 705-7207

kapurju@wsdot.wa.gov

Louisiana

Hossein Ghara

(225) 379-1302

hghara@dotd.la.gov

Utah

Jim McMinimee

(801) 965-4022

jmcminimee@utah.gov

Leware Construction Co.

Keith Waugh

(352) 787-1616

kwaugh@lewarecc.com

Mammoet

Bill Halsband

(281) 369-2200

bill.halsband@mammoet.com

Bridge Consultant

Mary Lou Ralls

(512) 422-9080

ralls-newman@sbcglobal.net

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008

slide16

How do I learn more?

www.aashtotig.org

Also: http://www.fhwa.dot.gov/bridge/prefab/

Keep AmericaMoving During Bridge ConstructionJugesh Kapur, P.E.Bridge Design Engineer Washington State DOT

NHI Webinar

June 26, 2008