Peter Willendrup, Peter Christiansen, Kim Lefmann McStas release 1.9 and beyond Emmanuel Farhi, Klaus Lieutenant 1 McStas team (RISØ/ILL) McStas 1.9 release and beyond
McStas Project status New features in McStas 1.9 New stuff in 1.9.1 and beyond Agenda 2 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Project status – strengthened efforts 'New' people: Peter Christiansen, Post doc at Risø from feb 1st. Will work on TS2 instruments and polarized neutron support in McStas (MCNSI input very welcome!) Project status 3 McStas team (RISØ/ILL) McStas 1.9 release and beyond
More than 20 (!) McStas oriented posters @ ICNS, Sydney! ICNS 2006 dissemination: 4 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Project Infrastructure: New, joint website @ www.mcstas.org Bugzilla VnCS alliance with VITESS New stuff in 1.9, november 16th '05 5 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Web tools: Web frontend – html based simulation frontend, based on work by ILL student C. Jean Will be 'extended' for two different applications: DMC PSI Powder machine: Upload powder structure, press the buttons, download virtual powder spectrum. (Beam time applications etc.) NMI3/MCNSI Brockhouse phonon simulator. 'Measure your own Nobel prize dataset' New stuff in 1.9, november 16th '05 6 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Components: PowderN (from Copenhagen University course) Isotropic_Sqw / Concentric components – (V. Hugovieux / E. Farhi) Source_simple (replacing four similar codes...) TOF version of Res_sample (TOF resolution functions, will be integrated in 1 component) Intensive tests done on Fermi choppers, Vitess_ChopperFermi (K. Lieutenant) New stuff in 1.9, november 16th '05 7 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Components: PowderN (from Copenhagen University course) Isotropic_Sqw / Concentric components – (V. Hugovieux / E. Farhi) Source_simple (replacing four similar codes...) TOF version of Res_sample (TOF resolution functions, will be integrated in 1 component) Intensive tests done on Fermi choppers, Vitess_ChopperFermi (K. Lieutenant) New stuff in 1.9, november 16th '05 8 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Components: PowderN (from Copenhagen University course) Isotropic_Sqw / Concentric components – (V. Hugovieux / E. Farhi) Source_simple (replacing four similar codes...) TOF version of Res_sample (TOF resolution functions, will be integrated in 1 component) Intensive tests done on Fermi choppers, Vitess_ChopperFermi (K. Lieutenant) New stuff in 1.9, november 16th '05 9 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Components: PowderN (from Copenhagen University course) Isotropic_Sqw / Concentric components – (V. Hugovieux / E. Farhi) Source_simple (replacing four similar codes...) TOF version of Res_sample (TOF resolution functions, will be integrated in 1 component) Intensive tests done on Fermi choppers, Vitess_ChopperFermi (K. Lieutenant) New stuff in 1.9, november 16th '05 10 McStas team (RISØ/ILL) Introducing McStas 1.9
Components: PowderN (from Copenhagen University course) Isotropic_Sqw / Concentric components – (V. Hugovieux / E. Farhi) Intensive tests done on Fermi choppers, Vitess_ChopperFermi (K. Lieutenant, G. Zsigmond) Source_simple (replacing four similar codes...) TOF version of Res_sample (TOF resolution functions, will be integrated in 1 component) New stuff in 1.9, november 16th '05 11 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Tools mcdaemon – on Unix, send -USR2 (save) signals to running process Many usage related adjustments to mcgui New stuff in 1.9, november 16th '05 12 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Documentation: Improvements to tutorial / teaching material (Copenhagen University course) Will provide 'extended' tutorial, eventually a complete teaching material for neutron course, build powder diffractometer (DMC), TAS (Rita-II), SANS (Sans-II @PSI). Many edits of the component manual New stuff in 1.9, november 16th '05 13 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Important bugfixes / validation results: PowderN tested against Squires/Bacon/... Isotropic_Sqw and PowderN in agreement GROUP misbehaviour solved New contributions: T. Vanvuure (ILL) – Advanced, physical Realistic PSD detector -”- Banana detector Possibly O. Kirstein (Ansto) – PST device K. Hewitt Klenø (Copenhagen Univ) – Chopper upgrades – see talk VRML support in mcdisplay – HTML/VRML format directly possible only with browser/plugin New stuff in 1.9.1 (march 06?) 14 McStas team (RISØ/ILL) McStas 1.9 release and beyond
JUMPS Concentric components First polarisation capable components? (Peter Christiansen) mcresplot for Scilab/Matlab mcformat PGPLOT -> other formats Sources (ILL source: Ageron Tripoli, VITESS) Volume data (PSD versus time (scan)) More example instruments Special TOF/TAS class instrument frontends: TAS with reciprocal space code – possible collaboration with M Koennecke, PSI, UB matrices etc. TOF with chopper phase angles -> chopper diagrams New stuff in 1.10 (autumn 06?) 15 McStas team (RISØ/ILL) McStas 1.9 release and beyond
Many exiting things to do now and in the future... :) The end... 16 McStas team (RISØ/ILL) McStas 1.9 release and beyond