Calcit Gospić Factory of calcite fillers

Elektro-Čelik d.o.o. Markovićeva 28 Križevci, Croatia. Delivery and commissioning of medium and low voltage cabinets. Calcit Gospić Factory of calcite fillers. Filling dosage machine with the raw material. Dosage machine and conveyor equipped with metal detectors and pull switch.

maleah
Download Presentation

Calcit Gospić Factory of calcite fillers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Elektro-Čelik d.o.o. Markovićeva 28 Križevci, Croatia Delivery and commissioning of medium and low voltage cabinets Calcit Gospić Factory of calcite fillers

  2. Filling dosage machine with the raw material.

  3. Dosage machine and conveyor equipped with metal detectors and pull switch

  4. Seting up a stone mill, 1.4 MW of power

  5. Equipping the mill in the factory

  6. Plant capacity is 100,000 tons of processed stone per year

  7. 4 silos with rail and truck access

  8. Separation

  9. Medium voltage switchgear, with 1250 distribution bus 10/20 kV composed of a line feeder and three transformer fields

  10. Shielded distribution bus 4000A between two low-voltage blocks

  11. Preparation for reception of medium voltage transformers 2.5 MVA, 2.5 MVA, 4.7 MVA

  12. Preparing to connect the transformer to the shielded distribution bus

  13. Anti-vibration connectors

  14. Fully equipped transformer station, a transformer with two secondaries

  15. Elektro-čelik is produced around 150 pages of execution project drafting disposition of transformers, pedestals for cabinets, and penetrations in walls for rail and distribution cables

  16. In electrical cabinets are installed 4000kg of copper

  17. For the purposes of installing copper bars we drilled ower 5000 holes.

  18. The largest breaker has rated current of 4000A

  19. Installation is performed in accordance of IEC60439

  20. All cabinets are assembled in accordance with TTA certification

  21. After making cabinets are transported to the construction site

  22. On site cabinets are installed and connected to the power cables

  23. T1 T2 T3

  24. T3 T2 T1 Frequency inverters

  25. Power enclosures for 12-pulse frequency inverter of 1.4 MW and associated fans

  26. Last checks and programming of the measuring equipment

  27. Cabinets for automatic compensation 2X600kVAr

  28. Fixed compensation of idling transformer 100kVAr

  29. Delivered electrical cabinets supplying 74 different loads