1 / 12
Download Presentation

Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Management Aim • To introduce best practice in the management of research projects outlining the need to plan, schedule and effectively control assignments. Structure • Conceptualising the problem • Research plan and proposal • Gantt Charts and PERT • Case Study Example: Herbal Revitalising Fruit Juice • Summary and conclusions

  2. Conceptualising the Problem • Research must be cost effective if it is to be useful and effective research requires considerable planning, scheduling and control. • Task 1: Get to the heart of the problem. Clear focus on issue faced. • Follow Rickards (1974) technique-goal orientation approach.: Problem, Need, Obstacles & Constraints. • Problem redefinition & focus on key unanswered questions.

  3. The Research Plan and Proposal A plan is a blueprint for the design, execution and monitoring of a study. • Start from unanswered questions. • Secondary data • Primary Data a) Select methodology: data collection method, means of analysis and sampling frame b) Data Analysis; c) Interpretation of Results; d) Presentation of results and scenario planning. • Conclusions

  4. Gantt Charts and PERT • Tools to aid effective management of market research projects. • PERT - Project Evaluation and Review Technique. Tool to monitor and organise resources to complete on time and within budget. • PERT 3-part technique a) Planning: identify all the stages and tasks involved in the project (work packages). b) Scheduling: determine start and finish times for phases c) Controlling: Schedule to monitor progress (milestones) & outputs (deliverables).

  5. Project Management Case Study • Feasibility Study for a herbal based revitalising fruit juice • A Flow Chart of the Methodology • Work Package Outlines - assign responsibility • SWOT Analysis • FCB Grid

  6. Example of Workpackages

  7. Gantt Chart

  8. Herbal based revitalising fruit juice: S.W.O.T Analysis • Strengths • Perceived High quality. • Revitalising. • Natural. • Fresh. • Supermarket interest - distribution outlets. • Young professional segment positive.

  9. Integrating Research and Promotional Activity (FCB Matrix) > HIGH INFORMATIVE AFFECTIVE Involvement HABITUAL LOW SATISFACTION > <<< Think Feel >>>

  10. Conclusions • Conceptualisation of problem. For example is there a gap in the market for a low fat cereal or is the present marketing mix for Clarks’ shoes satisfactory? • Specification of information required What information will best meet the research objectives? • Use secondary data. • If primary data collection, design method. Decide on sampling design / construction of data collection instrument. • Data Collection. • Analysis and interpretation of results. • Communicate the findings and implications. Integrate into decision-making.

More Related