1 / 17

MGTSC 352

MGTSC 352. Lecture 10: Aggregate Planning Leduc Control Example: Complete post-optimality analysis Case 2: Mountain Wear Set up and use solver to find minimum cost plan. Announcements. HW 3 grading For next week read Air Alberta p. 72 Crazy Joey’s p. 77. More Post-Optimality Analysis.

madra
Download Presentation

MGTSC 352

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MGTSC 352 Lecture 10: Aggregate Planning Leduc Control Example: Complete post-optimality analysis Case 2: Mountain WearSet up and use solver to find minimum cost plan

  2. Announcements • HW 3 grading • For next week read • Air Alberta p. 72 • Crazy Joey’s p. 77

  3. More Post-Optimality Analysis • Another semiconductor supplier offers Howie 5 more PsoCs for a premium of $150 each (above and beyond the going rate of $720 per unit). Should Howie buy these PSoCs? • Howie sometimes helps out with programming the LCDs, thereby increasing the amount of available programming time. Should he help out in this cycle? If so, how long should he help out? • Howie’s nephew offers to work in assembly for a premium rate of $12 per hour (above and beyond the going rate of $20 per hour). Should Howie hire his nephew? For how many hours?

  4. One More • Howie notices that with the currently optimal production plan, 168 of the available programming hours are not used. Howie wonders whether he could increase production and profits by training the programmers to help out with assembly. What would the optimal total net margin be if all programmers were also trained to do assembly?

  5. Other solvers • Survey • http://lionhrtpub.com/orms/surveys/LP/LP-survey.html • $1,000 ... $10,000 • Can solve very large problems (200,000 constraints) • Usually require front-end modeling language (such as AMPL) • Premium solver: $1,000 http://www.solver.com/

  6. Active Learning1 min., in pairs Mountain Wear • What decisions does Nathan Leung need to make to generate an aggregate plan for Mountain Wear? • What constraints (restrictions) must Nathan keep in mind? • Write down as many as you can think of

  7. Mountain Wear Case • What decisions does Nathan Leung need to make to generate an aggregate plan for Mountain Wear?

  8. Mountain Wear Case • What constraints (restrictions) must Nathan keep in mind?

  9. Summary of Data (pg. 49) • Materials cost: per unit • Labour requirements: hrs/unit • Labour availability: hours/employee/quarter • # of workers at beginning of year: • Labour cost: employee/quarter • Overtime labour cost: per hour • Hiring cost: • Layoff cost: • Inventory holding cost: per unit/quarter • Inventory at beginning of year: • Required safety stock: Look at Nathan’s plans in Excel

  10. Tradeoffs: “So which one of those did you want?” (pg. 50) Level and chase:

  11. Mountain Wear … • Can we find the lowest cost plan with solver?

  12. Active Learning: Formulate Mountain Wear Problem in English • 1 min., in pairs • Template: • Maximize / minimizes … • By changing … • Subject to …

  13. Extending the Mountain Wear Formulation • Should we include additional constraints? • Limit on overtime? • Limit on hirings / firings? • ? • How do the additional constraints impact cost?

  14. Air Alberta (pg. 72) Air Alberta is doing aggregate planning of flight attendant staffing for the next 6 months. They have forecast the number of flight attendant hours needed per month for March to August, based on scheduled flights, and wish to determine how many new attendants to hire each month. Each trained attendant on staff supplies 150 hours per month. A newly hired attendant is called a trainee during the first month, and each trainee’s net contribution is negative (-100 hours) because (s)he requires supervision, which detracts from the productivity of other attendants. Each trained attendant costs $1500 in salary and benefits per month while each trainee costs $700 per month. Normal attrition (resignations and dismissals) in this occupation is high, 10% per month, so Air Alberta never has any planned layoffs. Trainees are hired on the first day of each month and become attendants on the first day of the next month (with no attrition). As of March 1, Air Alberta has 60 trained attendants. Go to Excel

  15. What do you mean hire 1.413 attendants? • You can’t do that, right? • Right. • But: sometimes it’s better to ignore such details • Especially if the numbers are large: • Not much difference between hiring 123 and 124 people, so might as well allow fractional values

  16. For More realistic Against No sensitivity report May take longer to solve Not that important if numbers are big Integer Constraints: Include or leave out?

  17. Air Alberta (pg. 73) 1. Solver settings to find a least cost staffing plan: 2. The least cost staffing plan: 3. The total cost of this plan is $ 4. In which month does Air Alberta have the most excess attendant hours? 5. Air Alberta is considering running extra charter flights requiring 1000 flight attendant hours in either June or July. Which month would you choose to minimize total staffing costs? Why?