An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESA R&D program GNSS Evolution Program UpdateIWG 24 St Petersburg, June 2013D. Thomas : Head of SE – EGNOS & SBAS Division ESA UNCLASSIFIED – For Official Use

  2. Outline • EGNOS Second Generation (V3) • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  3. Why EGNOS GII (V3)? • EGNOS V3 will provide the Galileo SoL • International context is evolving: • New GPS frequencies (GPS L2C, L5) • Some existing frequencies will disappear (GPS L2 P(Y)) • New constellations are being developed • Other SBAS are coming or planned to be modernized • This new context opens the door for improved services (e.g. robust LPV200), new services (e.g. high precision), extended services (towards SBAS multiregional global coverage) • Multi-constellation GNSS for major Airlines (commercial aviation AIRBUS – BOEING) with a quasi – global coverage required in 2020-2025 • Maintains European Industry at the edge of GNSS technology

  4. Long term (2020-2025) plan – Global SBAS Extract of joint presentation SBAS provider IWG23 Dual Frequency / dual GNSS WAAS-EGNOS-MSAS-SDCM-GAGAN with expanded network of stations in South hemisphere Current Coverage WAAS-EGNOS-MSAS

  5. 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 EGNOS V2.2 & V2.3.1 EGNOS V2.3.2 & V2.4.x ( LPV 200 ) V2 to V3 Transition V3 Phase A Test - beds, phase 1 A X B1 V3 Phase B2 T B exp. Ph . 2 T B exp. Ph . 3 (TBC) V3 Phase C/D New avionics onboard DRAFT SBAS SARPS, IWG, Eurocae, L1/L5 ICD RTCA MOPS RTCA, SUGAST Avionics L1/L5 multi - const. development IWG, SBAS L1/L5 / multi - const. Standardisation - - - EGNOS V3 - Programme logic

  6. System Studies: EGNOS V3 activities Status (1/2) • Two parallel phase A activities launched in Jan-2011 • EGNOS V3 Mission consolidation • System functional architecture • Performance assessment (LPV200, CAT-1 Autoland, coverage extension) • (Preliminary) segment and interfaces definition • (Preliminary) Operation & SP concept • V2 to V3 Migration scenario • 2 Consortia led respectively by AST-G and TAS-F • 14 months duration for each contract • 2 Final reviews PRR successful in mid-2012

  7. EGNOS V3 activities Status (2/2) • Procurement of two parallel phase B activities: • EGNOS V3 Mission consolidation • System Preliminary Definition & performances (PDR) • Security (Threats, Design and OPS) • LCC costs assessment & Development Plan • V2 to V3 Migration scenario • Key V3 Experiments (algorithms, technologies, etc…) • Collaboration with Galileo Project • Direct Negotiation with the 2 Phase A Consortia • 2 years duration for each contract • Step 1: B1 to SRR (9 months): Budget approved • Step 2: B2 to PDR (15 months): Budget approved • SRRs Q3/2013 with both Consortia;

  8. DFMC SBAS Receiver Station Dev • Pre-qualified prototype for V3 purposes • Kick-start injection to V3 phase B projects • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Receiver Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  9. R & D Activites EGNOS V2 Both V2 and V3 Benefit R & D Activities EGNOS V3

  10. R & D Activities V3 phase B2 SRR PDR DFMC Standard V3 Pre-qualified Receiver Station IONO conditions/scenarios Testbed experiments Key technologies

  11. DFMC SBAS Receiver Station Dev • Pre-qualified prototype for V3 purposes • Kick-start injection to V3 phase B projects • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Receiver Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  12. High Integrity System Test Bed (Aviation focuses) – some 2012 results Assesses feasibility and interest of foreseen features Multi-frequency Multi-constellation Extension of service area Areas of improvement on top of EGNOS V2 system Through 5 sets of experimentations • Part of “European GNSS Evolution Program”, phase 2 • A laboratory for future EGNOS services dedicated to aeronautical users

  13. ON GOING AND FUTURE EXPERIMENTS Dual-frequency / Dual-constellation augmentation Components under development Operations Q1 2013 for Cycle 2a, Q2 for Cycle 2b REPLAY MODE ONLY

  14. ON GOING AND FUTURE EXPERIMENTS LPV200 AVAILABILITY DUAL FREQUENCY L1/L5 RESULTS (L1/L5) (L2P) Raw data models calibrated to real data capture

  15. FUTURE EXPERIMENTS (currently being procured) • Candidates for HISTB ext and/or NISTB • Baseline Mission variations (GPS/GAL) • Experimenting Augmentation of In orbit satellites (4+ IOV) + 8 Gate Pseudolites + GPS with representative V3 processing prototype • New integrity concept (AST-D) • Within Gate environment (helicopter, aircraft) ? • Etc ..

  16. System test beds to support V3 ARCTIC Testbed • Demonstration of an SBAS service in the ARCTIC Region enabling potential future EV3 mission evolution • Based on a adaptable SBAS testbed architecture developed by ESA (SPEED) in previous R & D Programme • Schedule : • Phase 1 : PDR Completed • Phase 2/3 : CDR, Development and Experiments 18 months duration. Start Mid 2013

  17. System test beds to support V3 ARCTIC Testbed • Specific SBAS issues related to ARCTIC region: • Maritime market • Representative user equipment • Alternative dissemination means enabling better extension than GEO • Extension of Ground Station network • Nominal & degraded IONO/scintillation monitoring • Improved IONO handling for the region

  18. Outline • EGNOS Second Generation (V3) • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  19. DFMC SBAS Receiver Station Development (RIMS) • Pre-qualified DFMC station for V3 (and also potentially for V2 obsoresolution). • Modular concept enabling any combination SFSC/DFMC • Full station (ant, clock, rx, front end computer) • Fully compatible with future qualification/certification requirements (not a throw-away item). • Interaction with both V3 phase B2 activities to V3 PDR end 2014 (and possibly beyond) • Upto 2 different receiver types to serve diversification needs if maintained for V3 • A few recurrent units will be fielded and provide invaluable support to V3 kernel design & developments ESA UNCLASSIFIED – For Official Use

  20. Outline • EGNOS Second Generation (V3) • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  21. IONO Workplan : Overview Users Contributing Receivers & Product Data MONITOR IONO Repository & Products Processing EGNOS V2 & V3 Projects Testbeds GALILEO Project CNES Others.. ASECNA Project Laboratories CNES DLR ICASES I & II Others…

  22. IONO Workplan : Activities Zoom • Current & Future Activities: • EV2 On-going activities to improve system availability and optimize GIVD/GIVE related algorithms. CPF changes are planned for V2.4.1P and V2.4.2. • EV2/EV3 Prolongation of the activities to upgrade the ionospheric reference scenarios (ICASES II) to support EGNOS V2.X operation and V3 development. Main objectives are to enlarge the set of available scenarios, to improved the database (Africa), further studies on the characterisation of the ionospheric . • EGEP R&D: • Ongoing studies for the improvement of SBAS in the Polar Regions Arctic Testbed. • Extension of MONITOR project. Further development to a central Iono data facility supporting all ESA EGNOS related activities. • Upgrade of tools to support Algo prototyping and performance tests.

  23. IONO Workplan : EV2 Release Road Map IONO Improvements IONO Improvements Stefan Schlueter : ESA IONO POC The European GNSS Programmes

  24. Outline • EGNOS Second Generation (V3) • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  25. Key SBAS Technology Developments Several Technological pre-development (presented 4th December 2012 ESTEC, ongoing activities) • Payload: • Development of Breadboard for Generative Payload for Regional Navigation Services • Reference Stations: • Design and Development of Interference Monitor System for GNSS Reference StationsCompleted • Design and Development of Antenna Protection Structure for GNSS Reference Stations (IMLP)Completed • Application of Dual-tracking Technique to GNSS Reference Stations (DTA) • Design and Development of Advanced Antenna & Receiver for GNSS Reference Stations (DADAR)

  26. Outline • EGNOS Second Generation (V3) • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Technology Developments • Complementary Studies • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  27. Complementary Activities • Signal Quality Monitoring for standardisation (GPS/GAL) • EGNOS – Galileo Working Group and associated worplans ESA UNCLASSIFIED – For Official Use

  28. Outline • EGNOS Second Generation (V3) • R&D Activities • Testbeds for V3 • DFMC SBAS Receiver Station Development (RIMS) • IONO Workplan • Key SBAS Technology Developments • Complementary Activities • SBAS in Africa ESA UNCLASSIFIED – For Official Use

  29. Other projectspending EC decision SBAS in Africa • Baseline work plan (awaiting for Award decision to start WO) EU 27 – V2.4.2 - 2016 (TBC) • Other opportunities: • Preparation finished (2011, 2012) • Phase B SOW is under preparation. KO due to start early 2014. ASECNA EGSA – EGNOS in SA

  30. ESA EGEP Program Status - Conclusion • Major achievements in maintaining momentum in EGEP activities for V3 System Requirements Reviews (SRR). • Current testbed experiments feeding V3 progammes with important inputs. Future testbeds will refine toward kernel prototypes for future developments towards Preliminary Design Review (PDR). • 2012 (V3 PRRs, Test Beds implemented with first significant results, innovating technology tested on the field) • Many EGEP Program Extension (2013-2015) activities being launched in support • Success in confirming EGNOS for Africa phase B

  31. Annexes