An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Christopher Leachman, BIM coordinator, HVAC engineer, COWI AS, Oslo Design team

  2. Topicfor discussion today • Keys to a successful BIM project • Practical examples of how Team T3 uses BIM

  3. Summary of T3

  4. Keys to a successful BIM project Infrastructure: Software Hardware How will the design team meet the goals that are set? BIM What BIM ambitions does the owner have?

  5. Technology • Shared model via IFC and Navisworks: Works • Design software: Work in progress

  6. Strategy • AVINOR: ambitions of maximal use of BIM

  7. Process – Organising to meet the BIM goals. • Responsibilities clearly defined. • BIM manuals. • Plan for use of BIM in QA process. • Use of model in different types of meetings. • Documentation, documentation, documentation…

  8. Responsibilities clearly defined

  9. BIM Manuals define organisation structure

  10. BIM Manuals define organisation structure

  11. BIM Manuals define organisation structure

  12. BIM Manuals define organisation structure

  13. Plan for use of BIM in QA process

  14. Use of model in different types of meetings • BIM meeting (get on track, and stay there) • Weekly ICM (TFK) meeting (Issue tracking with Solibri) • Design, coordination, planning meetings use model (Navisworks)

  15. Someexamplesofhowwe make useofthe BIM model, nowthatwe have one. Practical examples of how T3 uses BIM

  16. Old school: symbols in the ARCH drawings, objects in ours, coordination, changing, drawing, checking, re-drawing… New school: ARCH produces drawings with our objects. No symbols, or duplication. Coordination still required of course but no need for tedious cross-checking. Ceiling coordination

  17. Sprinkler calculations via Magicad. Time savings and documentation. Sprinkler calculations

  18. parameters from fire engineer transferred to ARCH to check fire classification of walls same technique for acoustical classification. Checking Fire classification

  19. BIM model instead of 2d sections

  20. BIM model instead of 2d sections

  21. Coordinating with the contractor

  22. NTI tools, Space tool

  23. Builders work. Utsparinger. Provision for voids. Magicadsystem editor. Makes keeping the revit system organized way easier… standard connections. massive time savings, when it works. BIM model save ustime and in….