1 / 15

Logistics for P5

Logistics for P5. Underground visit of CMS Detector with CMS Technical coordination We are in the middle of LS1 … what is going on on the detector? Tour of surface infrastructure and P5 site What is behind getting a huge experiment like CMS to work

leone
Download Presentation

Logistics for P5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Logistics for P5 • Underground visit of CMS Detector with CMS Technical coordination • We are in the middle of LS1 … what is going on on the detector? • Tour of surface infrastructure and P5 site • What is behind getting a huge experiment like CMS to work • Control Room, Labs, power, cryo, cooling, PC farm etc • Run Coordination, Technical Coordination and BRIL • We are in the middle of the Weekly Global Run #2 • Take advantage of chance to ask questions and participate in getting the experiment ready, tuning the CMS engine for Run II. • Ask questions about CMS and LHC • Many experts will be in P5, your guides are special chosen, please take advantage of interacting with them

  2. Outline of the afternoon • General program • 12:45-13:15 - travel to P5 • 13:15-14:20 lunch (tent+picnic) • 14:20-14:30 groupphoto • 14:30-17:30 talks/visits groups 1,2,3 • 18:00 bus return to CERN • Special program summer students: • As above except • 14:30-15:45 talks/visits summer students • 16:00 bus return to CERN for summer students

  3. Bus to P5 • Bus 1 = group 1 + summer students • Bus 2 = group 2 • Bus 3 = group 3 • Follow Umbrellas • Buses parked close to entrance A • Picnic lunch P5 Restaurant 1 PavelJez CMS Young Scientist Committee (Chair) DogaGulhan CMS Young Scientist Committee ZsuzsannaGarai CMS Secretariat

  4. Arrival P5, program begins with picnic lunch

  5. Afternoon visit in P5; Groups 1a,1b,2,3, 1b Summer students = 1a 1b Summer students = 1a 1b

  6. Session 1; Groups Groups 1a,1b,2,3 1b Group 3 ~ 45 people Surface Guides: 3a: Sergei Lusin 3a Martin Gastal 3a: Ken Bell 3b: Andrea Gaddi 3b Jean Fay 3b: DragoslavLazic Support: Jorgen D’Hondt (time keeper) Benoit Cure stationed in compressor plant to explain magnet (session 1 only) Group 2 ~ 45 people Guides: 2a Austin Ball 2a Francesco Palmonari 2b Wolfram Zeuner 2b ZoltanSzillasi Support: Luca Malgeri PavelJez Group 1b ~ 25 people Speakers: ChristophSchwick NielsDupont Support: Kersin Boras Silvia Goy Summer students (1a) ~ 30 Guides: Mick Storr Milena Quittnat (CMS YSC) Support: GianlucaCerminara Frank Hartmann

  7. Session 2; Groups 1a,1b,2,3 1b 1a Group 3 ~ 45 people Speakers: ChristophSchwick NielsDupont Support: Silvia Goy Jorgen D’Hondt Group 2 ~ 45 people Surface Guides: 2a: Sergei Lusin 2a: Martin Gastal 2b: Andrea Gaddi 2b: Jean Fay Support: DragoslavLazic Ken Bell PavelJez Summer students (1a) ~ 30 Guides: Mick Storr Milena Quittnat (CMS YSC) Support: Frank Hartmann, GianlucaCerminara Group 1b ~ 25 people Guides: 1b Austin Ball 1b Wolfram Zeuner 1b) Francesco Palmonari Support: David Stickland ZoltanSzillasi

  8. Session 3; Groups 1a,1b,2,3 Group 3 ~ 45 people Guides: 3a Austin Ball 3a Wolfram Zeuner 3b ZoltanSzillasi 3b David Stickland Support: Frank Hartmann Jorgen D’Hondt Group 1b ~ 25 people Surface Guides: 1b: Sergei Lusin 1b: Martin Gastal 1b: Andrea Gaddi Support Jean Fay DragoslavLazic Group 2 ~ 45 people Speakers: ChristophSchwick NielsDupont support: Silvia Goy Roberto Carlin Ken Bell

  9. CMS Technical Coordination 16 Jul 2014 DH Last change 16 Jul 2014 AB Induction tours: P5 Surface Itinerary Start at Dump resistor End in control room 12.Electrical supply & diesel 13. Exhibition tent 11.Detector labs overlook 10.Main workshops Pit head cover etc 14.Control rooms 9. Pixel cold lab plant 8. He compressors & dry gas 1.Dump resistor 2 Cooling & HVAC 6.Cooling towers 3. Gas mixing 4.Gas dewars 5. CMS He dewars 7. LHC He dewars No entry in SGX, SF, SR Quick look in SUX,SH. (work permitting).

  10. Induction tours: P5 Surface Itinerary Start at Dump resistor End in control room CMS Technical Coordination 16 Jul 2014 DH Last change 16 Jul 2014 AB • Dump resistor • Cooling and HVAC • Gas mixing • Gas dewars • CMS He Dewars • Cooling Towers • LHC He Dewars • He compressors & dry gas • Pixel cold lab plant • Main Workshops • Detector labs overlook • PIT head cover • Electrical supply & diesel • on way to tent explain orientation of tunnel,  structure of Point 5 caverns, location of Points 4 & 6 • Exhibit tent • view CMS Scale model as preparation for underground visit • Server room upstairs, Control Room No entry in SGX, SF, SR Quick look in SUX,SH. (work permitting).

  11. Other Logistics • Lunch, Juice breaks & general P5 logistics • Noemi Beni • Tom Dodington • Tent, photograph logistics • MarzenaLapka, AchintyaRao

More Related