150 likes | 261 Views
Logistics for P5. Underground visit of CMS Detector with CMS Technical coordination We are in the middle of LS1 … what is going on on the detector? Tour of surface infrastructure and P5 site What is behind getting a huge experiment like CMS to work
E N D
Logistics for P5 • Underground visit of CMS Detector with CMS Technical coordination • We are in the middle of LS1 … what is going on on the detector? • Tour of surface infrastructure and P5 site • What is behind getting a huge experiment like CMS to work • Control Room, Labs, power, cryo, cooling, PC farm etc • Run Coordination, Technical Coordination and BRIL • We are in the middle of the Weekly Global Run #2 • Take advantage of chance to ask questions and participate in getting the experiment ready, tuning the CMS engine for Run II. • Ask questions about CMS and LHC • Many experts will be in P5, your guides are special chosen, please take advantage of interacting with them
Outline of the afternoon • General program • 12:45-13:15 - travel to P5 • 13:15-14:20 lunch (tent+picnic) • 14:20-14:30 groupphoto • 14:30-17:30 talks/visits groups 1,2,3 • 18:00 bus return to CERN • Special program summer students: • As above except • 14:30-15:45 talks/visits summer students • 16:00 bus return to CERN for summer students
Bus to P5 • Bus 1 = group 1 + summer students • Bus 2 = group 2 • Bus 3 = group 3 • Follow Umbrellas • Buses parked close to entrance A • Picnic lunch P5 Restaurant 1 PavelJez CMS Young Scientist Committee (Chair) DogaGulhan CMS Young Scientist Committee ZsuzsannaGarai CMS Secretariat
Afternoon visit in P5; Groups 1a,1b,2,3, 1b Summer students = 1a 1b Summer students = 1a 1b
Session 1; Groups Groups 1a,1b,2,3 1b Group 3 ~ 45 people Surface Guides: 3a: Sergei Lusin 3a Martin Gastal 3a: Ken Bell 3b: Andrea Gaddi 3b Jean Fay 3b: DragoslavLazic Support: Jorgen D’Hondt (time keeper) Benoit Cure stationed in compressor plant to explain magnet (session 1 only) Group 2 ~ 45 people Guides: 2a Austin Ball 2a Francesco Palmonari 2b Wolfram Zeuner 2b ZoltanSzillasi Support: Luca Malgeri PavelJez Group 1b ~ 25 people Speakers: ChristophSchwick NielsDupont Support: Kersin Boras Silvia Goy Summer students (1a) ~ 30 Guides: Mick Storr Milena Quittnat (CMS YSC) Support: GianlucaCerminara Frank Hartmann
Session 2; Groups 1a,1b,2,3 1b 1a Group 3 ~ 45 people Speakers: ChristophSchwick NielsDupont Support: Silvia Goy Jorgen D’Hondt Group 2 ~ 45 people Surface Guides: 2a: Sergei Lusin 2a: Martin Gastal 2b: Andrea Gaddi 2b: Jean Fay Support: DragoslavLazic Ken Bell PavelJez Summer students (1a) ~ 30 Guides: Mick Storr Milena Quittnat (CMS YSC) Support: Frank Hartmann, GianlucaCerminara Group 1b ~ 25 people Guides: 1b Austin Ball 1b Wolfram Zeuner 1b) Francesco Palmonari Support: David Stickland ZoltanSzillasi
Session 3; Groups 1a,1b,2,3 Group 3 ~ 45 people Guides: 3a Austin Ball 3a Wolfram Zeuner 3b ZoltanSzillasi 3b David Stickland Support: Frank Hartmann Jorgen D’Hondt Group 1b ~ 25 people Surface Guides: 1b: Sergei Lusin 1b: Martin Gastal 1b: Andrea Gaddi Support Jean Fay DragoslavLazic Group 2 ~ 45 people Speakers: ChristophSchwick NielsDupont support: Silvia Goy Roberto Carlin Ken Bell
CMS Technical Coordination 16 Jul 2014 DH Last change 16 Jul 2014 AB Induction tours: P5 Surface Itinerary Start at Dump resistor End in control room 12.Electrical supply & diesel 13. Exhibition tent 11.Detector labs overlook 10.Main workshops Pit head cover etc 14.Control rooms 9. Pixel cold lab plant 8. He compressors & dry gas 1.Dump resistor 2 Cooling & HVAC 6.Cooling towers 3. Gas mixing 4.Gas dewars 5. CMS He dewars 7. LHC He dewars No entry in SGX, SF, SR Quick look in SUX,SH. (work permitting).
Induction tours: P5 Surface Itinerary Start at Dump resistor End in control room CMS Technical Coordination 16 Jul 2014 DH Last change 16 Jul 2014 AB • Dump resistor • Cooling and HVAC • Gas mixing • Gas dewars • CMS He Dewars • Cooling Towers • LHC He Dewars • He compressors & dry gas • Pixel cold lab plant • Main Workshops • Detector labs overlook • PIT head cover • Electrical supply & diesel • on way to tent explain orientation of tunnel, structure of Point 5 caverns, location of Points 4 & 6 • Exhibit tent • view CMS Scale model as preparation for underground visit • Server room upstairs, Control Room No entry in SGX, SF, SR Quick look in SUX,SH. (work permitting).
Other Logistics • Lunch, Juice breaks & general P5 logistics • Noemi Beni • Tom Dodington • Tent, photograph logistics • MarzenaLapka, AchintyaRao