multiple indicator cluster surveys survey design workshop
Download
Skip this Video
Download Presentation
Multiple Indicator Cluster Surveys Survey Design Workshop

Loading in 2 Seconds...

play fullscreen
1 / 12

Multiple Indicator Cluster Surveys Survey Design Workshop - PowerPoint PPT Presentation


  • 79 Views
  • Uploaded on

Multiple Indicator Cluster Surveys Survey Design Workshop. Data Entry Using Tablets / Laptops. Content of the Presentation. Preparation Training Fieldwork Summary- Q&A. Preparation. Supplies Old and/or New Devices. Preparation. Specifications Windows mobile vs Windows Tablets:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Multiple Indicator Cluster Surveys Survey Design Workshop' - lam


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
content of the presentation
Content of the Presentation
  • Preparation
  • Training
  • Fieldwork
  • Summary- Q&A
preparation
Preparation
  • Supplies
  • Old and/or New Devices
preparation1
Preparation
  • Specifications
  • Windows mobile vs Windows

Tablets:

Full Microsoft Windows  7 or 8 (NO windows RT tablets)

PDAs:

Windows Mobile versions 5 and 6 (UNICODE is not supported)

preparation2
Preparation
  • Sampling
  • Questionnaires
  • Preparation of the Programs
  • High Level Technical Support
  • Flow of the data from field to central office
mics capi system
MICS CAPI System
  • All applications to collect and administer data are written in CSPro
  • Three systems:
    • Interviewers - data collection – Tablet/PDA
    • Supervisors – data monitoring and control –Tablet/PDA
    • Central Office - centralized data and monitor fieldwork - PC
interviewers data collection
Interviewers - data collection
  • Start a new Household Questionnaire in a household not previously visited.
  • Return to a Household Questionnaire that is not yet finished (i.e. is still incomplete or has only been partially saved).
  • Review and/or modify a completed Household Questionnaire.
  • List of all the households assigned will appear
interviewers data collection1
Interviewers - data collection
  • Transfer data for all questionnaire for this cluster from the interviewer to the supervisor
  • Share household data for this cluster with other interviewers
  • Receive household data from other interviewers – this option is used by the person receiving the household data before conducting an individual interview.
  • Modify IDs/delete individuals – this option can be used to correct problems with IDs in data files, for example, when
    • Data was entered in the wrong cluster number
    • The wrong household number was used
    • The wrong individual’s line number was used when collecting the individual interview
    • The wrong interviewer code was used when entering the system
  • Receive system updates from the supervisor
  • Receive household assignment from the supervisor
supervisors data monitoring and control
Supervisors – data monitoring and control

Activities to control the sample

  • Review the sample control file
  • Assign households for the PSU
  • Send household assignments to interviewers

Receiving questionnaires from an interviewer

List interviewer questionnaires

Create file to send to central office

training
Training
  • 2 weeks training (paper questionnaires) including 3 days field exercise

+ 1 week extra training (PDAs/Tablets)

+ 4-5 days extra field exercise

  • High Level Technical Support
fieldwork
Fieldwork
  • Team composition (no field editor)
  • Roles and responsibilities of supervisors and measurers
  • Starting the fieldwork at central location
  • High Level Technical Support
monitoring the field
Monitoring the Field
  • Field Monitoring
  • Team visits
  • Spontaneous checks
  • Field check tables
  • Feedback
ad