Draft WG5 Cavities Topics ( with overlap with WG2)

Loading in 2 Seconds...

play fullscreen
1 / 19

Draft WG5 Cavities Topics ( with overlap with WG2) - PowerPoint PPT Presentation


  • 90 Views
  • Uploaded on

Draft WG5 Cavities Topics ( with overlap with WG2). General Cavity parameters (R&D goal & LC operating goal) Cavity type * Hi Gradient R&D * Materials R&D * Input coupler * Tuners (fast & slow) * Fabrication Processing (including.EP, HT…) Cryo Module & String Assembly

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Draft WG5 Cavities Topics ( with overlap with WG2)' - kimn


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
draft wg5 cavities topics with overlap with wg2
Draft WG5 Cavities Topics ( with overlap with WG2)
  • General Cavity parameters

(R&D goal & LC operating goal)

  • Cavity type
  • * Hi Gradient R&D
  • * Materials R&D
  • * Input coupler
  • * Tuners (fast & slow)
  • * Fabrication
  • Processing (including.EP, HT…)
  • Cryo Module & String Assembly
  • * Industrialization

Those noted by “*” are listed topics for WG5 from organizers and will be denoted by * also in what follows

work plan
Work plan
  • Before Snowmass
    • Preliminary Strawman choice for “ Baseline Configuration Design” (BCD)
    • And alternative(s) for Alternate Configuration Design (ACD)
  • Previous WSs have considered TESLA as starting strawman
  • Baseline NEED NOT be present existence proof (TESLA)
  • But one should show clear justification & path between evolution from

Tesla BCD(s) ACDs (with priorities)

work plan continued
Work Plan continued
  • Enumerate justification of baseline and alternatives
    • Pros and cons of choices, technical advantages/ disadvantages
    • Potential Mods or improvements to choices
    • Technical advantages, Increased technical potential
    • Potential cost reductions
    • Risk and reliability impacts
    • R&D necessary and time scale
      • Of the baseline
      • Of alternatives to supersede baseline status.
proposed methodology
Proposed methodology
  • We propose to put forward a set of “preliminary” reference design parameter choices and prioritized alternatives prior to the meeting.
  • In the discussion/ presentation sessions we will ask for people who do not believe a particular reference selection correct, that they present arguments for alternative to the selected choice.
  • Improvements to and needed design reviews of the choice would follow
  • This discussion would be followed by discussions of alternative options and their priority, and importance. Leading to an R&D plan
  • For instance -
slide5
Steps for design convergence and R&D plan
      • Put out a draft of tentative parameter items choices Prior to Snowmass
      • Encourage people to make arguments that other alternatives are better for “base line” choice
      • Change selection if appears justified-consensus
        • make lists of pros & cons
      • Discuss work to be done or to be reviewed on the primary choice (its R&D)
      • Discuss and prioritize other options
      • Outline their needed R&D
      • Identify potential cost reduction, technical risk, technical advantages, increased potential
schedule at snowmass
Schedule at Snowmass
  • Agenda WG 5 Week one Aug 15- 19
  • Tues Day 2 Time available 120, 120min, 90 minGG
  • (WG 2- Mod, Kly, llrf, RF dist)
  • WG 5- (This may be too much on this day)
      • Review of strawman for BCD,
      • Gradient and Q0 R&D goals & LC spec,
      • Cavities, geometries
      • Fab, Processing &
      • Industrialization
      • Resources for cavity test
slide7
Wed Day 3 Time alloted 120, 120 min, GG90min
  • WG 2&5 – Cryo module, Couplers.., Cryo temp opt
  • WG 2 & 5? with GG3 (availability- Cryo systems, tunnel layout, modulators)
  • WG5 and 2? with GG1? on gradient issues, and packing factor/ slot length?
  • Thurs Day 4 Time alloted 120, 120 min, GG90min
  • WG 5
  • Morning-
  • Materials R&D – and basic research towards BCD and ACD
  • tuners (including step motors), and mag shielding
  • Afternoon
  • Draft Conclusions - some with WG2?
  • WG5 with GG availability, tuners, ?? …
criteria
Criteria
  • Baseline recommendation (BCD)
    • Need not be an existing design, but should be either
      • A mature design or procedure
      • A modification easy to extrapolate to without significant R&D program
      • A design or procedure, though not completely certified, likely to be the one of choice
      • One for which costing with contingencies is possible or available
      • One with such significant benefit over existing concept to warrant its choice
      • Should have a clearly defined R&D path to bring to credible stage
criteria cont1
Criteria cont1
  • Primary Alternative to baseline (ADC)
    • Design or concept warranting aggressive R&D effort.
    • Likely to overtake baseline if pursued
    • Likely to have significant technical or cost advantages
    • Define R&D required to bring to credible stage
wg5 cavities topics
WG5 Cavities Topics
  • General parameters & concepts
    • Gradient & Q
    • Goal for cavity R&D
    • Specification for ILC 500
    • Reserve
    • Reliability & Risk
    • Cost- benefit
    • Linac packing factor
  • Cavity types
    • Needs evaluations of all aspects.
    • TESLA -Mods to TESLA?
      • Beam pipe length & diameter
      • HOM and pickups
      • Helium vessel & Conical end
      • End group cooling, end group design
      • Flanges and Sealings
      • General design cleanup
wg5 topics cont 1
WG5 topics cont 1
  • Cavity types continued
    • Low loss - impact of smaller iris?,cell to cell coupling, beam dynamics , alignment tolerances
    • Reentrant- or hybrid reentrant - cleaning & structural
    • Other variants
    • Superstructure
  • *Hi Gradient R&D
    • Processing
      • BCP w Ti & 1200C, EP, mechanical grinding, 120 bake
      • BCP w single crystal, or large grain
      • Understand process parameters to reduce spreads
      • Discuss paths toward industrialization
    • Processing toward industrialization (see industrialization)
    • Margin & qualification specifications
      • What gradient margin, Q margin
      • What dark current and x-rays
    • Risks - vacuum accidents
wg5 topics cont 2
WG5 topics cont 2
  • *Materials R&D
    • Do we need 1300 C Ti treatment?
    • Single & large grain
      • Connection w processing
    • Nb/Cu
    • Basic reaserch
      • Q improvements
  • *Fabrication
    • E beam
    • Hydroform
    • Spin
    • Tolerances
    • End groups - can one improve fab efficiency?
  • *Industrialization
    • Key issues toward
    • A plan and schedule
    • Quality control & reproducibility
wg5 topics cont 3
WG5 topics cont 3
  • Tuners
    • Types mechanical
      • End type Saclay
      • Blade type
      • Coaxial
      • Other
    • Piezo (range for highest gradient?)
    • Magnetostrictive
    • Motors- warm vs cold
  • Magnetic shielding
wg5 with wg2 topics cont 4
WG5 with WG2 topics cont 4
  • *Input couplers
    • Varieties
    • New ideas
    • Processing
    • Cost drivers
    • R&D for cost or processing
  • CryoModule
    • The string: bellows, GVs, HOM abs, BPM/Quad
    • The quad/BPM location
    • Cavity slot length
    • Cavity & module Interconnect and their real estate
    • Generic module types
      • With quad/ without q/ separate quad module
cavities wg5 key people
DESY

Dieter Proch

Lutz Lilje

W-D Moeller

R Brinkmann

Detlef Reschke

J Sekutowicz

KEK-Japan

Kenji Saito

Toshiyasu Higo

Yasuo Higashi

Eiji Kako

Shuichi Noguchi

Hiroshi Matsumoto

Sergey Kazakov

Kenji Ueno

JLab

Peter Kneisel

Rao Myneni

Charles Reece

Jean Delayen

Warren Funk

John Mammosser

Joe Preble

Cavities WG5 key people

This is just a first attempt at trying

to identify people from the overall

list.

As I don’t know people at some Labs

well there may be gross oversights

Or errors

cavities wg5 key people cont 1
FNAL

Pierre Bauer

Harry Carter

H Edwards

Mike Foley

Don Mitchell

Nikolay Solyak

SLAC

Chris Adolphsen

J Cornuelle

Saclay/Orsay

Terry Garvey

O Napoly

Cornell

Hasan Padamsee (2nd week)

Mathias Liepe

Rongli Geng

INFN

Carlo Pagani

Industry

Michael Peiniger

Tony Favale

Tony Nelson?

Other

John Corlett

Brian Rusnak

Cavities WG5 key people cont 1
couplers with wg5 chris adolphsen transp
Progress in processing TTF3 couplers at Orsay

Status of new designs

Plans for characterizing coupler performance for 35 MV/m operation

Modeling of coupler multipacting

Proposed tests to understand the coupler processing limits

Coupler plans for the XFEL

ILC industrialization and cost issues

FNAL

Nikolay Solyak

Don Mitchell

KEK

Hiroshi Matsumoto

Sergey Kazakov

Shuichi Noguchi

Eiji Kako

Cornell

Sergey Belomestnykh

LLNL

Brian Rusnak

Orsay

Terry Garvey

Alessandro Variola

DESY

W-D Moeller

Couplers (with WG5)Chris Adolphsen transp
cryomodules with wg5 chris adolphsen transp
Status of TTF cryomodules

Design changes for XFEL-cryomodules

Design changes for the ILC

Schedule for TTF/XFEL/SMTF prototypes

Industrialization of the XFEL cryomodules

Identification of critical requirements

Existing and planned cryomodule infrastructures

Cryomodule integration issues

Separate Quad / Cavity sections

Adoption of international standards

FNAL

Harry Carter, Tug Arkan, Cristian Baffo, Don Mitchell, Nikolay Solyak, Andrew Hocker, Helen Edwards

Tom Peterson (or Tom Nicol) ?

JLAB

Warren Funk, Peter Kneisel, Jean Delayen, Reece, Preble

Cornell

M. Liepe

DESY

Lutz Lilje, Carlo Pagani, Dieter Proch, Detlef Reschke, B. Peterson

KEK

Shuichi Noguchi, Kenji Saito, Fumio Furuta, Yuichi Morozumi, Toshiyasu Higo, Eiji Kako, Norihito Ohuchi

Cryomodules (with WG5)Chris Adolphsen transp
baseline configuration document chris adolphsen transp
Baseline Configuration Document Chris Adolphsen transp

At Snowmass, outline linac choices, giving pro’s and con’s for various items or specifying those to which there is general agreement

  • Tunnel Layout
    • Cut and Cover
    • TDR like
    • Deep (> 20m) Tunnels
  • Modulators
    • Pulse Transformer
    • Marx Generator
    • Other
  • Klystron
    • Power Level
    • Multibeam tube
    • Sheet beam tube
    • Other
  • RF Distribution
    • TDR like
    • Other configurations
  • Quad and BPM package
    • Integrated at center
    • Integrated at end
    • Separate
  • Quad
    • Cos(2Phi) 80 mm bore
    • Superferric 40 mm bore
  • BPM
    • Narrow band cavity
    • Wide band
  • Cryo Cooling Issues
    • Segmentation
    • Shield temperatures
    • Overhead
  • Other
    • Modulator/Klystron Cooling
    • Tunnel Electronics
  • Coupler
    • TTF3
    • Higher power variation
    • Waveguide like
  • Cavity Design
    • TDR
    • Low Loss
  • Cavity Gradient
    • 25, 30, 35 MV/m
    • Dark current limits
  • Cavity Tuners
    • End
    • Blade
    • Other
  • Cavities per Cryomodule