Cryostat Cavity Conditioning Update - Resolving Issues, Calibrations, and Observations

Update on cryostat cavity operations from 8/07/2014 to 08/07/2014: Addressed cavity cavity issues, resolved power meter and polarity problems, identified PLL box fix, encountered multipacting effects, worked on temperature sensor data, and planned calibrations during cool-down. Late shifts due to fixing interlock system.

Download Presentation

Cryostat Cavity Conditioning Update - Resolving Issues, Calibrations, and Observations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UK4R Status Maria Navarro, Karim Hernandez 8/07/2014

  2. Update up to 08/07/2014 10:58 • Cavity in the cryostat at 4.15K • Few problems solved: • Power meter for the PT and PR were swapped in the switch box • AB’s had wrong polarity. *PLL box need to be fixed • Yesterday at 4.45K: • A lot of multipacting effects at very low field level ( ~ 0.1 MV), which did not allow us to get even the calibration point • We let the cavity for conditioning 3 hr before the scan • Scan of QvsU in pulsed mode • Now temperature sensor in the cavity are getting data but the sensors from cryo were dead. • Calibration for the cold part at the HOM and LOM frequencies. • Tobias also got the explanation for the double-exponential like decay that was observed in previous measurements

  3. Update up to 08/07/2014 10:58 • At 8:30 start the cool down to 2.25 K • We are going to get calibration point during the cool down at : • different temperatures • different Frequencies • Problem with the interlock system. We are looking now to get this fixed • We need to work late, so we need to decide the time shifts