Jicamarca in Review. The Jicamarca Radio Observatory Near Lima, Peru. By Jorge Chau and Ronald Woodman (IGP) Donald T. Farley and Wesley E. Swartz (ECE-CU) David Hysell (EAS-CU). Swartz 03/11/7. Jicamarca in Review, 1999-2003. An Introduction to Jicamarca (DTF)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Jicamarca in Review' - keahi


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
jicamarca in review
Jicamarca in Review

The Jicamarca Radio

Observatory

Near Lima, Peru

By

Jorge Chau and Ronald Woodman (IGP)

Donald T. Farley and Wesley E. Swartz (ECE-CU) David Hysell (EAS-CU)

Swartz 03/11/7

2003 November NSF Panel Review of Jicamarca

jicamarca in review 1999 2003
Jicamarca in Review, 1999-2003
  • An Introduction to Jicamarca (DTF)
  • Management Overview and Changes - people (DTF)
  • Science Highlights - ideas (DLH)
  • Infrastructure Development - tools (JLC)
  • Other Instruments/projects (JLC)
  • Outreach, Education, Societal Impact (WES)
  • Response to the Last Panel’s Report (WES/DTF)
  • Maintenance Challenges (JLC? Or WES?)
  • Budget Challenges (WES)
  • The Next Five Years (DLH)

2003 November NSF Panel Review of Jicamarca

maintenance challenges
Maintenance Challenges
  • Lots of electronics
  • Lots of antenna connections (corrosion)
  • Aging vehicles
  • But, there are really no single-point failure modes (baring some cataclysmic event) that would cause an extended down time: Multiple systems with multiple transmitters, receivers, computers, but final transmitter tubes now run about $80,000

2003 November NSF Panel Review of Jicamarca

budget challenges
Budget Challenges
  • Additional operational costs for new instruments
    • JULIA – cost was not previously included in the main budget
    • SOUSY – fuel expected to be $8K/yr for 500 hours of operation
    • Bistatic – Equipment funded separately; routine operational costs
    • Operating with 4 big transmitters – increases peak demand billing
  • Replacement of aging vehicles
    • Need a new one approximately every 2 years
  • Replacement of any failure of transmitter tubes
    • $15K for drivers (expected lifetime is 15K hours: 2 at 13K hr, 1 at 3K hr)
    • $80K for finals (expected lifetime is 15K hours: 2 at 13K hr, 1 at 3K hr)
    • $40K for SOUSY finals

2003 November NSF Panel Review of Jicamarca

broad category budget breakdown
Broad Category Budget Breakdown

The fine print: Proposed for 2004-2005: $1.5M (with wish list items)

2003 November NSF Panel Review of Jicamarca

budget wish list
Budget Wish List
  • Electronic steering of main array (top priority)
    • 128 – phase switches plus control ($120…split over 3 years)
  • Restoration of electronic steering of SOUSY radar
    • 4-phase selection option $30K
    • 8-phase selection option (original) $45K
  • Spare transmitter tubes
    • 1.5-MW Main Transmitter Final: $80K
    • 100-KW Main Transmitter Driver (4CX4000G): $15K
    • 300-KW SOUSY Final: $40K
  • Misc.
    • Lab equipment
    • Computers and networking equipment to stay current

2003 November NSF Panel Review of Jicamarca

wish list in perspective
Wish List in Perspective

Highest priority on bottom

2003 November NSF Panel Review of Jicamarca

bare bones wish list but retaining electronic steering of main beam
Bare-Bones Wish List But Retaining Electronic Steering of Main Beam

Highest priority on bottom

Subject to no transmitter

failures in first three years.

2003 November NSF Panel Review of Jicamarca

bare bones wish list modified by a transmitter failure
Bare-Bones Wish List Modified by a Transmitter Failure

Highest priority on bottom

2003 November NSF Panel Review of Jicamarca

proposed yearly budget distribution
Proposed Yearly Budget Distribution

2003 November NSF Panel Review of Jicamarca

budget in perspective
Budget in Perspective

Partial Year

2003 November NSF Panel Review of Jicamarca

slide12