Kopta Slough Flood Damage Reduction and Habitat Restoration Project “ Kopta Slough Project ”

Applying Sacramento River Conservation Area Principles and Our Understanding of Natural River Process in the Feasibility Study for the Kopta Slough Project. Kopta Slough Flood Damage Reduction and Habitat Restoration Project “ Kopta Slough Project ”. Science.

kaiyo
Download Presentation

Kopta Slough Flood Damage Reduction and Habitat Restoration Project “ Kopta Slough Project ”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Applying Sacramento River Conservation Area Principles and Our Understanding of Natural River Process in the Feasibility Study for the Kopta Slough Project

  2. Kopta Slough Flood Damage Reduction and Habitat Restoration Project “Kopta Slough Project”

  3. Science Conservation Area Principles Opportunity

  4. Conservation Area Principles Physical Environment Biological Environment Human Environment

  5. Kopta Slough Project Location

  6. Kopta Slough Project Area In Trust Woodson Bridge

  7. Project Elements Transfer 648-acre Kopta Slough Property to the State Restore 176 acres of riparian habitat Remove 5,600 lft of rock revetment Reduce unwanted erosion on Woodson Bridge State Recreation Area Property and protect Woodson Bridge and the City of Corning Sewer Outfall Reconnect Kopta Slough to the main channel of the Sacramento River

  8. About 1 mile

  9. 2-Year Flood – 100,270 cfs 10-Year Flood – 168,548 cfs 1997 Flood – 199,700 cfs 100-Year Flood – 293,700 cfs

  10. Historical Channel Animation

  11. Restore natural fluvial and floodplain processes

  12. Project Goals Restore natural fluvial and floodplain processes Provide advance mitigation for flood projects Reduce flood management operation and maintenance Reduce unwanted bank erosion to protect public resources Expand recreational opportunities

  13. Quantitative Area Re-worked Erosion/Migration Rate Stream Power Greco and Larsen, 2007 Dynamic/Non-linear Range of Possibilities Quickly Assess Scenarios Qualitative

  14. Feasibility of Constructed Channel

  15. There are some potential negative impacts that we will have to address Potential for increased erosion downstream of Woodson Bridge Potential to transition the confluence of Deer Creek downstream

  16. Opportunity Science

  17. Thank You Co Author: Adam Henderson, DWR Graphics: Alison Groom, DWR Meander Video: Rob Irwin, SRCAF