Projects

Loading in 2 Seconds...

play fullscreen
1 / 13

Projects - PowerPoint PPT Presentation


  • 129 Views
  • Uploaded on

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Projects' - kailey


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements and goals easily and according to the global standards and specially API standards and in time although the time provided to it is limited and critical.

Projects

slide2
Why we start any project?

There are many points that could lead to start a project

The company's expansion, by starting up a new rig.

The company's equipment upgrading, by installing a new equipment.

Modification done to simplify and assist the operation of the rig and make it comply with the global standards, especially API standard.

Problems facing operation or maintenance crew due to breakdowns

Rig in time &Safely

Professional personnel

All Materials Needed

The Time Frame

Project planning

Engineering department does believe that project planning is the key to succeed any project; projects can run on time and interact effectively with both operators and suppliers. Everyone involved understands what is wanted and emerging problems are foreseen (and dealt with) long before they cause damage.

EXCUTE

SELECT

ISSUE

Plan

projects done
Projects done

2-1

2-2

2-3

2-4

New rigs & Refurbishing old rigs

Top Drive & new equipment installation

Equipment overhaul

In progress projects

slide4
Rig up project for the following rigs:

Rig ..………………………………………start operation

ST# 1 (2000 HP)……………………………January,2006

ST# 2 (1500 HP)…………………………....January,2006

ST# 3 (2000 HP)……………………………January, 2007

ST# 4 (2000 HP)……………………………September,2007

ST# 5 (1500 HP)…………………………..April ,2008

ST# 6 (1500 HP)…………………………..End of April ,2008

ST# 7 (1000 HP)…………………………..July ,2008

ST# 8 (1500 HP)…………………………..June,2008

ST# 9 (2000 HP…………………………...March, 2008

ST# 10 (1500 HP)……………………….....End of June,2008

ST# 11 (2000 HP)……………………….....End of Oct.,2008

ST# 12 (2000 HP)………………………….Febrauary,2009

ST# 21 (650 HP-work over)………………January, 2007

ST# 22 (650 HP-work over)………………November ,2007

ST#23 (650 HP-work over)………………End of March ,2008

ST#24 (650 HP-work over)………………End of August,2008

2-1

Sinotharwa Rigs

slide5

Rigs Refurbishing

  • St1 Refurbished , April 2007

Upgrade the rig (Mast, substructure sandblast including MPI)

Mud System modification &upgrading upon the operator needs & operation demands

slide6

Rigs Refurbishing

St2 Refurbished , December 2007

Modify the Rigs (Mast, sub base sandblast steel fabrications, renew rig floor including MPI)

Fabricated high pressure mud

pump lines & standard standpipe manifold

slide7

No need for traditional Kelly

Drill complete stand

2-2

Top Drive & new equipment installation

Eliminates the

hazard of

Drilling operation

Reduce the

Drilling time

By 30%

Reduce man power

  • 2-1) Top Drive
  • Reasons to use Top Drive over classical drilling equipment
slide8

So we

  • Install the Top Drive on the following Rigs:
  • (Varco TDS-11SA)
      • ST#1,3,4,5,6,8,12
  • (Tesco ECI900 )
      • ST#9,10,11
slide9

New installed equipments

Man Rider Installation for all rigs

Install H2S & LEL system on all rigs

Install Fuel Purifier on all rigs

Install new alarm panels for main engines

Isolate all engines exhaust pipe manifolds

Install SCR CO2 fire fighting system on all rigs

slide10

2-3

Equipment overhaul

ST#1,9Complete overhaul for the Power TongST#2Top end overhaul for the ShanDong power engine Complete overhaul for the ShanDong power engineST#5,7Complete overhaul for the Air hoist 5 ton

slide11

ST#10Complete overhaul for the Crown Block

ST#1,21Complete overhaul for Mud Pump

slide12

2-4

In progress projects

2-4-1) Jack Up rig

  • Start fabrication : By End of year 2008
  • Electrical Rig ,VFD system
  • MAST 170 ft clear height
  • Rotary table 49 ½ ”
  • TDS -8SA top drive system
  • Drawworks power: 4600 HP.
  • Operating water depth: 400 ft (122 m).
  • Drilling depth: 30000 ft (9,144 m).
  • Quarters capacity: 120 persons.
  • 3 -Mud pumps 2200 HP.
  • Power system of 5 Cat Engines ( 3516B)

& 1 Emergency Cat Engine (3512).

  • Three pedestal cranes with 120 ft (36.6 m) boom.
  • Horizontal & vertical pipe handling systems.
  • Three lifeboats (60 person each).
  • Four life rafts (35 persons each).
  • Cascading shaker system & 1 vacuum degasser.
  • Storage of 4,720 bbls fuel oil.
  • Storage of 10,540 bbls drill water.
  • Storage of 2,180 bbls potable water.
  • Storage of 15,800 tons preload ballast.
  • Storage of 17,400 cu.m bulk mud/cement.
  • Storage of 3,960 bbls active & reserve pits.
  • 5000 sack storage.
slide13

2-4-2) Badr yardBadr yard is one of the expansion projects that our company is looking forward to complete as soon as possible.Badr yard will play a very big role for the engineering department which will deduct the outsourcing and hiringcost of workshops to make overhauls in.