90 likes | 121 Views
In this project, develop a system following steps & documents outlined. Focus on integration & testing for customer acceptance. Select from options like Automobile, Airplane, Distributed Computing, Train, Spacecraft, Health Monitoring. Each group creates a System Engineering Management Plan, a Test & Evaluation Master Plan, and an A-Spec. Presentation required. Languages: English.
E N D
EMIS 7307 Projects • Each study group will ‘develop’ a system. • System to be selected by the group from list (next slide) or approved by Bell. • I’m your customer. • You will define all the steps and documents. • Define and selectively develop program schedule, system, documents. • Emphasis is on all integration aspects and appropriate testing along the way to customer acceptance. • Each group will develop a SEMP, a TEMP and an A spec. • Each group will make a presentation (1 hour). • Every member presents • Each presentation is a portion of a major design or test review.
EMIS 7307 Systems for Projects • Select one or suggest one to Bell for approval: • Automobile • Airplane • Distributed computing • Train • Spacecraft • Health monitoring
EMIS 7307 Systems for Projects • Automobile: • Seats 5 -220 lb, 6’5’’ adults. • 0-60 mph in 6 sec. • Accelerates as quickly as it stops. • Has auto-steer and auto-trip capability: • New capability that uses GPS and obstruction sensing to navigate safely from place to place. • 2 years to IOC.
EMIS 7307 Systems for Projects • Airplane • Must host surveillance equipment (provided by another vendor). • Accommodates aircrew and 5 sensor operators. • Delivered with operator USI subsystems installed. • Must fly from unimproved airfields. • Used by all military services. • All weather flying capability. • 4 years to IOC, if modified. • 6 years to IOC, if new aircraft.
EMIS 7307 Systems for Projects • Distributed computing: • World -wide interconnected users. • Business data processing. • Scientific data analysis. • Includes all communication, computing and data storage. • 2 years to IOC.
EMIS 7307 Systems for Projects • Passenger train: • Magnetically levitated. • 220 mph normal cruise. • Less than 80dB noise at 15 feet from train. • May use modified version of existing cars for passengers. • Include first 100 miles of ‘track’ from DFW to Waco. • 3 years to IOC.
EMIS 7307 Systems for Projects • Spacecraft: • Mercury mapper. • Both IR and radar. • Directed subcontractors for the sensors. • 3 year on-station life. • Uses existing ground stations. • 3 years to launch from shuttle in orbit.
EMIS 7307 Systems for Projects • Health monitoring: • Used to monitor ambulatory patients from their homes. • Realtime notification of physicians of out of tolerance parameters (50). • Directed subcontractors for the sensors. • 5 years between mandatory service. • Automatic instructions to patient i.e. not just an alarm. • 2 years to competitor’s “roll-out”.
EMIS 7307 Instructions • Develop “mini”(10 pages each): A Spec with section 4, SEMP, and a Master Test Plan. • Define subsystems and their performance requirements. • Include engineering organization with roles and responsibilities. • Use IPTs. • Summarize written documents for a Powerpoint classroom presentation of which everyone presents an approximately equal portion. • For the remaining information you need to know to do your project... ask Bell. • If no answer in two days, make and document your assumptions then continue.