slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28 PowerPoint Presentation
Download Presentation
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28

Loading in 2 Seconds...

play fullscreen
1 / 22

Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28 - PowerPoint PPT Presentation


  • 542 Views
  • Uploaded on

Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010. Overview – Stormwater Drainage System. 2,800 miles of Roadside Storm Ditches 3,600 miles of Storm Sewer Line 14 Stormwater Pump Stations 1,900 Outfalls

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28' - johana


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Storm Drainage and Street

Maintenance and ConstructionPresentation for the Flooding and Drainage CommitteeSeptember 28, 2010

overview stormwater drainage system
Overview – Stormwater Drainage System
  • 2,800 miles of Roadside Storm Ditches
  • 3,600 miles of Storm Sewer Line
  • 14 Stormwater Pump Stations
  • 1,900 Outfalls
  • 9 Detention Basins
overview city streets and bridges
Overview – City Streets and Bridges
  • 16,000 lane-miles
    • 2,400 lane-miles –Major Thoroughfares
    • 5,600 lane-miles - Collectors
    • 8,000 lane-miles - Local Streets
  • 1,619 Bridges
  • 2,400 Traffic Signals
storm drainage maintenance
Storm Drainage Maintenance
  • Major Off-Road Ditch Inspection & Maint.
    • $2,408,231
    • 244 miles
  • Herbicide Application
    • $424,395
    • 16,000 Acres
slide5

Storm Drainage Maintenance

  • Off-Road Drainage Easement Mowing
      • $388,746
      • 255 miles
  • Remove Litter From Drainage Easements
      • $1,200,000
      • 8,500 Cubic Yards
storm drainage maintenance6
Storm Drainage Maintenance
  • Roadside Ditch Maintenance (De-silt & Re-Grade)
      • $12,584,751
      • 275 miles
  • Right-of-Way Mowing
      • $3,498,716
      • 6,784 miles
storm drainage maintenance7
Storm Drainage Maintenance
  • Storm Water Inspections
    • $1,574,212
    • 1,400 Inspections
  • Outfall Inspections & Representative Monitoring
    • $483,508
    • 418 Inspections
  • Inlet/Manhole & Line Inspections
    • $3,218,296
    • 60,000 Inlets / Manholes
    • 240 miles of Line
storm drainage maintenance8
Storm Drainage Maintenance
  • Inlet/Manhole & Line Cleaning and Repair
    • $8,728,408
    • 21,788 Manholes and Inlets
    • 89 miles of Line
  • Gutter Sweeping
    • $1,507,459
    • 21,500 lane-miles
street maintenance
Street Maintenance
  • Pothole Repair
    • $936,026
    • 2,000 Tons
  • Skin Patching
    • $6,552,185
    • 14,000 Tons
street maintenance10
Street Maintenance
  • Concrete Repair
    • $6,347,459
    • 262,000 Cubic Feet
  • Overlay
    • $9,693,729
    • 140 Lane lane-miles
street maintenance bridges
Street Maintenance: Bridges
  • Bridge / Barricade Maintenance
    • $3,044,741
    • 5,350 Total
street maintenance12
Street Maintenance
  • Maintain Traffic Signs
    • $2,675,114
    • 40,000 Units
  • Maintain Pavement Markings
    • $1,315,276
    • 4,300,000 Linear Feet
  • Maintain Traffic Signals
    • $5,839,346
    • 6,450 Units
  • Maintain Freeway Lighting
    • $1,263,543
    • 15,000 Units
maintenance total
Maintenance Total
  • O & M FY11
  • Storm: $33.0 M
  • Street: $48.8 M
stormwater design construction
Stormwater: Design & Construction
  • Drainage Improvement Projects
    • $50,700,000
    • 1,628 Acres
  • LDP (Local Drainage Program)
    • $2,400,000
    • 26 Sites
  • Detention
    • $4,500,000
    • Subregional Design
street construction
Street Construction
  • MT Overlay
    • $7,000,000
    • 56 lane-miles
  • MT Reconstruction
    • $79,900,000
    • 57 lane-miles
  • MT Construction
    • $14,140,000
    • 10 lane-miles
street construction neighborhood street reconstruction
Street Construction: Neighborhood Street Reconstruction
  • Curb & Gutter
    • $15,000,000
    • 7.5 lane-miles
street construction bridges
Street Construction: Bridges
  • Wooden Bridge Structure Replaced with Wood or Concrete
    • $1,186,059
    • 8 Structures Total – 4 wood, 4 concrete
capital totals
Capital Totals
  • CIP FY11
  • Storm: $57,600,000
  • Street & Bridge: $87,170,000 (PIB & Metro)
  • Total: $144,770,000
select fy 11 capital projects storm drainage
Select FY 11 Capital Projects: Storm Drainage
  • Local Drainage Projects
  • Kirkwood Drive (Briar Forest)
  • Whiteheather, Phase III
  • Astoria Boulevard (Scarsdale)
  • Brays Village
  • Bellaire West
select fy 11 capital projects street bridge
Select FY 11 Capital Projects: Street & Bridge
  • NSR 450 (East End)
  • Morningside Improvements
  • Yale Paving: Tidwell to Parker
  • Sabo Paving: Kingspoint to Fuqua
  • Cambridge Paving: Holly Hall to IH 610
  • Hirsch: Kelley to Crosstimbers
  • Little York: TC Jester to Alabonson
  • Parker: Hardy to Eastex
capital projects cip fy 11 to 15
Capital ProjectsCIP FY 11 to 15
  • Storm: ~$57M per year
  • Street: ~$100M per year