1 / 23

Gemini ExAOC kickoff

Gemini ExAOC kickoff. Monday Agenda. 8:30-9:30: Coffee, CfAO lobby. 9:30 start Introduction: Bruce (10 min+20 min introduction) 10:00 Science case: James (20 min+25 min discussion) (Moderator: Bruce) Key science questions for instrument design 10:45-11:00: Break 11:00

jkreider
Download Presentation

Gemini ExAOC kickoff

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gemini ExAOC kickoff

  2. Monday Agenda • 8:30-9:30: Coffee, CfAO lobby. • 9:30 start • Introduction: Bruce (10 min+20 min introduction) • 10:00 • Science case: James (20 min+25 min discussion) (Moderator: Bruce) • Key science questions for instrument design • 10:45-11:00: Break • 11:00 • Introduction to Gemini instruments and environment: Les (30 min) (Moderator: Dave) • overview of Gemini instrument environment • outline of Gemini committee structure (Rene Doyon) • 11:30 • Project structure, plan and timetable: Dave Palmer (15 min+15 min discussion) (Moderator: Les) • project deliverables and timetable

  3. Monday Agenda 1:00 Lessons from other systems: (60 min) (Moderator: Bruce) -discuss broad lessons from previous projects -Altair (Jean-Pierre) (10-20 min) -Lick , Keck, OSIRIS, Trident, etc. 2:00: ExAO System overview and error budget: Bruce (20 min+40 min discussion) (Moderator: James Graham) -discussion of error budget -key technology choices to be made 3:00-3:25 break 3:25-4:10 Science Instrument (moderator: James Graham) • Differential imaging principals and concepts: Rene (20) • Integral field unit/OSIRIS: James (10) • Science instrument concepts discussion (15) 4:10-4:45: Technology development and verification (Bruce) (moderator: Dave Palmer) 4:45-5:30 Wrapup and discussion of ExAO concepts: -calibration outline (Wallace) -alternative nuller concepts (Shao) -why we should build this at the south pole using non-redundant aperture masking (Jamie) 5:30-7:30 Barbeque dinner, CfAO patio area (bring a jacket or sweater!)

  4. Generalized PSF noise expansion • Error power spectra can be evaluated analytically or in small simulations • This assumes that all error sources are uncorrelated • This also neglects the fourth-order term • A useful approach because end-to-end simulations are prohibitive; some noise terms only begin to dominate in 60 minute exposures!

  5. Error terms: atmospheric fitting 5 second monochromatic image

  6. Aliasing error 5 second monochromatic image

  7. Temporal bandwidth 5 second monochromatic image

  8. WFS measurement noise 5 second monochromatic image

  9. XAOPI 0 nm static errors, 5 MJ/500 MYr planet, 15 minute integration

  10. XAOPI 1 nm static errors, 5 MJ/500 MYr planet, 15 minute integration

  11. XAOPI 2 nm static errors, 5 MJ/500 MYr planet, 15 minute integration

  12. XAOPI 5 nm static errors, 5 MJ/500 MYr planet, 15 minute integration

  13. Error budget

  14. Relative weight of error terms

  15. Error budget w. 90% PSF subtraction

  16. Error budget: missing terms • Chromaticism: • Atmospheric dispersion (with/without correction?) • Beam displacement errors • Scintillation • Very preliminary calculations indicate this doesn’t dominate at 10-7 • Optics surface roughness • Optical properties as input rather than spec • Post-coronagraph error leakage • Coronagraph properties

  17. Error budget: refinement • Speckle lifetime modelling (by SPIE?) • Better power spectrum modeling (PAOLA) • PSF differencing modeling • Fourth-order terms • Verification through simulation

  18. Tech development areas • AO: MEMS • AO: CCD • Coronagraph: masks and apodizers • Dichroic? • Others”

  19. PSDI Front End Short temporal coherence laser Lens and Aperture Stop Optical MEMS Device Variable neutral density filter Diffraction aperture Half-wave retardation plate Variable delay path Polarizers Diffraction aperture (for PSDI mode) Optical fibers Testbed Area Polarization beam splitter Quarter-wave retardation plates Interferometer CCD camera Piezoelectric phase shifter Image CCD replaces Diffraction aperture for Far-Field mode. Computer system ExAO testbed

  20. MEMS measurements

  21. Testbed plans • June: Flatten MEMS, demonstrate high-contrast PSF • Summer: exercise MEMS, test other MEMS • Fall: demonstrate SFWFS • Correct phase errors (plates?) • 2005: Design integrated white-light testbed • 2006: Test • Other goals? Algorithm tests?

  22. We need an better name! Gemini eXtreme Coronagraph GeXCo

More Related