This presentation provides an overview of the safety monitors introduced in 2004 to ensure public safety in gas transmission. It explains the requirements of the Gas Safety (Management) Regulations 1996 and how the safety monitors address the risk of a supply emergency. The methodology for determining the storage requirements and load protection through isolation and monitoring is also discussed.

jerrykruse
Download Presentation

Gas Transmission Safety Monitors: Background and Methodology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006

  2. Safety Monitors – background • Define levels of storage that must be maintained through the winter period • Introduced in 2004 to replace ‘Top-up’ • ‘Top-up’ focused on maintaining security of supply: Safety Monitors focus is public safety • Requirement of National Grid Gas’ Safety Case that action is taken to ensure storage stocks do not fall below the Safety Monitor levels - these decay as the winter progress

  3. Gas Safety (Management) Regulations 1996 • Requires anyone conveying gas in a network to prepare a Safety Case and for the Safety Case to be accepted by the HSE • The Safety Case must contain particulars which describe arrangements for a number of items listed in Schedule 1 • These are high level requirements which must be described in detail in the Safety Case – GS(M)R does not define how a specific requirement is to be met. • The relevant requirement in Schedule 1 is clause 16 • 16 - Particulars to demonstrate that the duty holder has established adequate arrangements to minimise the risk of a supply emergency, where a “supply emergency" means an emergency endangering persons and arising from a loss of pressure in a network or any part thereof

  4. GS(M)R Safety Monitors • The GS(M)R Safety monitor arrangements form part of National Grid’s detailed demonstration that it has arrangements in place to minimise the risk of a supply emergency • They address the risk posed by the possibility of insufficient storage being available for a 1 in 50 duration winter • The arrangements have been accepted by the HSE as discharging our responsibility in this area and we have a legal obligation to follow those arrangements • Any change in arrangements would constitute a material change to the Safety Case and National Grid would have to present a case which demonstrated that the new arrangements were at least as safe as the current arrangements

  5. Loads protected by Isolation NTS Interruptibles LDZ Interruptibles NTS Power Firm NTS Industrial Firm DM (excluding priority customers) Loads protected by Monitor Priority Firm DM Ireland Firm All NDM >5860 MWh NDM 2196-5860 MWh NDM 732-2196 MWh NDM 73-732 MWh NDM 0-73 MWh NDM Safety Monitors – methodology Concept – sufficient gas held in store to support those customers who can not be physically isolated from the network, requirements include isolation process of large loads All loads categorised into two groups:

  6. Supplies – assumptions (1) • “Baseload” – non storage supplies that are not limited by ‘space’, includes: • Beach • Interconnector • Grain (LNG Imports) • 10 mcm/d supply risk to cover for supply uncertainty, notably import assumptions

  7. Supplies – assumptions (2) • Storage supplies • Long – Rough • Medium – • Includes Hornsea and Hatfield Moor deliverabilities only • Includes Hornsea, Hatfield Moor, Hole House Farm and Humbly Grove space (reduced at onset to reflect start-up uncertainty) • Short – 4 LNG storage sites • Total storage supply level ~ 110 mcm/d (~1200 GWh) • Total storage space ~ 4000 mcm (~ 43,200 GWh)

  8. Supply / demand component – loads protected by monitor

  9. 1 in 50 Firm load Baseload supplies underpins storage requirements (96% of supply)

  10. 1 in 50 demands by load type

  11. 1 in 50 load protected by isolation Isolation ~1300 GWh (120 mcm/d) Monitor (Supply / Demand)

  12. 1 in 50 load protected by monitor

  13. Supply / demand component • 10 mcm/d supply risk included in September analysis to cover for supply uncertainty, notably import assumptions • Supply risk had to be identified at time due to UNC requirements • Supply risk located in Long not to unsettle markets & Long considered lowest risk of monitor breach

  14. Non - supply / demand component – load protected by isolation

  15. Safety Monitors – Protected by Isolation

  16. Isolation Component • Supply risk has a lesser impact than in supply / demand • Isolation needs established from observed behaviour from winter exercises (Krakatoa, Moscow) • Improved industry response would reduce isolation needs • Support for Isolation process is up to 48 hours • All above isolation needs are similar

  17. Total Requirement for December • Final requirement is lower than combined needs of Supply Demand & Isolation due to some reduction for “double counting” i.e. Supply Demand for Day 1 and Isolation for Day 1

  18. Monitor profiles

  19. Monitor Profile Methodology • Storage space and duration requirements are known for all storage types for protected by monitor and protected by isolation • Protected by monitor is a winter long requirement • Protected by isolation is a one off requirement • Need to develop 2 key relationships: • Demand days and temperatures (CWV’s) • Latest dates in a winter when such temperatures could occur

  20. Day Number / Temperature Relationship Long isolation Long supply / demand

  21. Calculation of Profiles • Protected by isolation is a one off requirement • Need to identify latest date when isolation could occur • A different requirement is calculated for each “Day” i.e. the Day 1 requirement is much earlier in winter than say Day 62 • Protected by monitor is a winter long requirement • Need to identify latest requirement • Need to identify earlier needs to establish within year profile – review all previous winters • Profiles are then combined

  22. Latest occurrence of cold (isolation)

  23. Long safety monitor profile Monitor Isolation