ivy
Uploaded by
11 SLIDES
208 VIEWS
110LIKES

Numerical Methods for Structural Analysis of Poles and Columns in Fluid Environments

DESCRIPTION

This progress report details the use of numerical methods to analyze a 40-ft long, 0.826-ft diameter pole and a rigid column with a 1 ft^2 cross-sectional area modeled as elastic material. Incorporating these structures into simple open-channel flow models, results have shown discrepancies, requiring further refinement. Future work includes comparing results from LS-Dyna with given equations, creating a mesh for the pole in water, and expanding to full-scale modeling. Expected delays may arise from using LS-Dyna wood properties and mesh creation challenges. Despite challenges, this study aims to improve analysis accuracy and model pole behavior in fluid environments.

1 / 11

Download Presentation

Numerical Methods for Structural Analysis of Poles and Columns in Fluid Environments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report Stephanie Soon University of Hawaii at Manoa ssoon@hawaii.edu 07/06/12

  2. Numerical methods • Pole: 40 ft long, 0.826 ft diameter • Modeled as elastic material • Column: 1 ft2 cross-sectional area • Rigid • 2 mph

  3. Simple open-channel flow models • Incorporated pole and column

  4. Results to Date • Timestep: 0.1 ms • 10,400 elements • Max force: 11 kips

  5. Results to Date • Timestep: 0.1 ms • 18,800 elements • Max force: 14.5 kips

  6. Results to Date

  7. Intended Future Work • Examine discrepancy between results from LS-Dyna and given equations • Create a mesh for circular pole in water • Expand to full-scale

  8. Gantt Diagram

  9. Expected Delays/Problems • Using LS-Dyna wood properties • Making mesh for circular pole in water • Making the pole flow with the fluid

  10. Summary • In-air transverse impact • Results do not correlate well with given equation • Simple open-channel flow models • Needs further refining • Will likely encounter a number of difficulties