The 500 MHz coax installation, 112 MHz cathode survey/bakeout, beam line vacuum/leak check, FPC & laser cross section installation, area clean-up, welding scaffolds and more completed efficiently.
E N D
Coherent Electron Cooling Injector Installation
Maintenance Day work completed • The 500 MHz coax installation complete • 112 MHz cathode survey/bakeout complete • Established beam line vacuum/leak check 112 MHz QHS/112 MHz piping process lines welded. • FPC & laser cross section installed • Area clean-up • Survey DS stands and solenoids • Welding scaffolds complete, Cable scaffolds installed • Move/Fix 2z2 gate close mechanism (Folz) • 112 MHz Cavity & QHS insulating vacuum components • Aligned solenoids and installed chamber stands