1 / 7

SAM status at NIKHEF

This document summarizes the SAM Admin Meeting held on May 16, 2001, detailing the installation status of SAM v2_1_2, which was installed on March 13, and the current storage of approximately 4000 reco files. Issues discussed include the challenges of file accessibility and error reporting within the SAM system. Plans for the future focus on the installation of new components, optimization of FBS jobs, and ensuring proper file management across various directories for enhanced local analysis.

hubert
Download Presentation

SAM status at NIKHEF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAM status at NIKHEF Willem van Leeuwen SAM Admin Meeting May 16, 2001 SAM Admin Meeting

  2. Installation & ‘production’ • v2_1_2 installed on March 13 (thanks Vicky) • about 4000 reco files (mcp05) stored • gen, d0gstar, sim declared SAM Admin Meeting

  3. Problems encountered • Declared files not always found • Not all sam commands return error code (solved) • Files in sam not readable (still open …) SAM Admin Meeting

  4. SAM@SARA • May 14: file stored on teras.sara.nl with SAM (rcp) • cd /home/sam/private • mv rcp RCP • Files are migrated to tape robot • but are still declared in directory • Directory structure year/month/day • Who enters these destinations in SAM ? SAM Admin Meeting

  5. Plans (1) • Install pmc06 • creating minbias files now • Run pmc06 • send sam errorlogs to sam-admin • optimize fbs jobs • Store files @ sara • for local analysis SAM Admin Meeting

  6. Plans (2) • Read files from sara • Adopt the role of a consumer • Enter the world of projects, groups • Become a sam admin SAM Admin Meeting

  7. 1.2 TB mcc request fbs(rcp,sam) farm server SAM DB file server fbs job: 1 mcc 2 rcp 3 sam fbs(mcc) datastore mcc input FNAL SARA mcc output node 50 + control 40 GB data metadata SAM Admin Meeting

More Related