html5-img
1 / 3

Activities of TOF assembly@CERN(Feb. 2008)

Activities of TOF assembly@CERN(Feb. 2008). SM15: Completed LV cables installation HV cables tested VME 4 crates test & mounted FEA cards & record ID Amphenol cables done (both) FEAC cards & cables installation Gluing done for both sides Pulser test : done.

howie
Download Presentation

Activities of TOF assembly@CERN(Feb. 2008)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activities of TOFassembly@CERN(Feb. 2008) • SM15: Completed • LV cables installation • HV cables tested • VME 4 crates test & mounted • FEA cards & record ID • Amphenol cables done (both) • FEAC cards & cables installation • Gluing done for both sides • Pulser test : done

  2. Activities of TOFassembly@CERN(Feb. 2008) • SM16 : 20 % done • Cooling pipe • Aluminum frame done • gas leak test • Put mylar to protect interface cards • FEA cards & recode ID SM15 SM16

  3. Summary & Milestone • Summary (1 post doc. & 2 students) • Cabling : FEA, FEAC cards & Amphenol cables for SM15 • Test & cabling : LV cables, HV cables, control cables SM15 & SM16 • SM15 : 100 % Completed • SM16 : 20 % Completed • Total : 10 SMs installed@pit + 5 SMs waiting for next installation • 86% of milestons have been achieved. • Milestone • Assembly@CERN : 3 SMs to be done • Next installation period : • 5 SMs (Mars 10th ~ 14th) • 3 SMs (April 7th ~ 11th)

More Related