Activities of TOF @CERN(Mars-May 2008)

Activities of TOF @CERN(Mars-May 2008). Jinsook Kim, Yongwook Baek. Activities of TOF assembly@CERN(Mars-April 2008). SM16: Completed LV cables installation HV cables tested VME 4 crates test & mounted FEA cards & record ID Amphenol cables done (both) FEAC cards & cables installation

bjorn
Download Presentation

Activities of TOF @CERN(Mars-May 2008)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activities of TOF @CERN(Mars-May 2008) Jinsook Kim, YongwookBaek

  2. Activities of TOFassembly@CERN(Mars-April 2008) • SM16: Completed • LV cables installation • HV cables tested • VME 4 crates test & mounted • FEA cards & record ID • Amphenol cables done (both) • FEAC cards & cables installation • Gluing done for both sides • Pulser test : done

  3. Activities of TOFassembly@CERN(Mars-April 2008) • SM17& SM18 : 100 % done • Cooling pipe • Aluminum frame done • gas leak test • Put mylar to protect interface cards • FEA cards & recode ID • LV cables installation • HV cables tested • VME 4 crates test & mounted • FEA cards & record ID • Amphenol cables done • FEAC cards & cables installation • Gluing done for both sides • Pulser test : done • Move to P2

  4. Activities of TOF@CERN(May 2008) • Check using test program : • Control cable connections • DRM connection • Fix & test : • Slow control cables • TTC signal cables • Installation : • Grounding cables • LV power cables • Optic fiber links

  5. Summary & Milestone • Summary (1 post doc. & 1 students) • The assembly of TOFs has been completed in time. • All SMs have been installed @P2 • Milestone • Commissioning • Cosmic run (magnet on) Period: 2nd & 3rd week of June